Permit: T18RW03044
Permit Details
Apply Date:
07/11/2018
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP will be installing a new overhead transformer bank on the pole at the northwest corner of The Mark job site. This transformer bank is replacing an existing bank that was damaged during the fire.
Completed Inspections
Permit Status: Final
Permit Number: T18RW03044
Permit Description: TEP will be installing a new overhead transformer bank on the pole at the northwest corner of The Mark job site. This transformer bank is replacing an existing bank that was damaged during the fire.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2018 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Final. No Issues. |