Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18RW02966
Permit Details
Apply Date:
07/06/2018
Applicant:
UNIVERSITY OF ARIZONA -PLANNING DESIGN & CONSTR
Description:
REPAVE EXISTING ALLEY BETWEEN FREMONT AND PARK AVES SOUTH OF 6TH STREET. INSTALL ADA RAMPS ON THE NORTHEAST AND NORTHWEST CORNERS (ONLY) OF 7TH AND WARREN 1. BASE COURSE MUST BE COMPACTED TO A MINIMUM OF 100% OF DETERMINED MAX DENSITY. 2. ASPHALTIC CONCRETE SHALL CONFROM AND BE PLACED PER PAG STANDARD SPECIFICATION FOR PUBLIC IMPROVEMENT (SSPI) 3. ASPHALT SHALL BE SOURCED FROM A TDOT APPROVED SUPPLIER. 4. CONTRACTOR SHALL PROVIDE ALL MATIERAL AND COMPACTION TESTING PER PAG SSPI. 5. CONTRACTOR SHALL PERFORM STORMWATER POLLUTION PREVENTION BEST MANAGEMENT PRACTICES. 6. EXISTING DRAINAGE PATTERNS SHALL NOT BE ALTERED.
Contractors:
- ASHTON COMPANY INC CONTRACTORS *T
- SOUTHERN ARIZONA PAVING & CONSTRUCTION CO
Completed Inspections
Permit Status: Final
Permit Number: T18RW02966
Permit Description: REPAVE EXISTING ALLEY BETWEEN FREMONT AND PARK AVES SOUTH OF 6TH STREET. INSTALL ADA RAMPS ON THE NORTHEAST AND NORTHWEST CORNERS (ONLY) OF 7TH AND WARREN
1. BASE COURSE MUST BE COMPACTED TO A MINIMUM OF 100% OF DETERMINED MAX DENSITY.
2. ASPHALTIC CONCRETE SHALL CONFROM AND BE PLACED PER PAG STANDARD SPECIFICATION FOR PUBLIC IMPROVEMENT (SSPI)
3. ASPHALT SHALL BE SOURCED FROM A TDOT APPROVED SUPPLIER.
4. CONTRACTOR SHALL PROVIDE ALL MATIERAL AND COMPACTION TESTING PER PAG SSPI.
5. CONTRACTOR SHALL PERFORM STORMWATER POLLUTION PREVENTION BEST MANAGEMENT PRACTICES.
6. EXISTING DRAINAGE PATTERNS SHALL NOT BE ALTERED.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2018 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Final. No Issues. |