Permit: T18RW02795
Permit Details
Apply Date:
06/20/2018
Applicant:
SOUTHWEST GAS
Description:
15 LF WILL BE INSTALLED WITHIN THE SIDEWALK VIA EXCAVATION AND 85 LF WILL BE INSERTED WITHIN ABANDONED GAS LINE TO CROSS 6TH ST WITHOUT PAVEMENT CUTTING.
Contractors:
- TEAM FISHEL
Completed Inspections
Permit Status: Final
Permit Number: T18RW02795
Permit Description: 15 LF WILL BE INSTALLED WITHIN THE SIDEWALK VIA EXCAVATION AND 85 LF WILL BE INSERTED WITHIN ABANDONED GAS LINE TO CROSS 6TH ST WITHOUT PAVEMENT CUTTING.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2018 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Final. No Issues. |