Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
06/18/2018
Applicant:
SOUTHWEST GAS
Description:
EMERGENCY (2) 5 X 5 BELLHOLES IN BLKTOP FRONT-TO REPAIR/REPLACE GAS LINE-EMERGENCY--WORKED ON 06/07/2018 NPL TO DO BLKTOP REPAIR -PAVEMENT MORATORIUM- MILL AND INLAY REQUIRED 50 FEET EACH DIRECTION BEYOND REPAIR
Contractors:
  • TEAM FISHEL
  • UNDERGROUND CONSTRUCTION CO INC

Outstanding Activity Conditions

Permit Number - T18RW02727
Permit Status: Final
Permit Description: EMERGENCY (2) 5 X 5 BELLHOLES IN BLKTOP FRONT-TO REPAIR/REPLACE GAS LINE-EMERGENCY--WORKED ON 06/07/2018 NPL TO DO BLKTOP REPAIR -PAVEMENT MORATORIUM- MILL AND INLAY REQUIRED 50 FEET EACH DIRECTION BEYOND REPAIR
Total Outstanding Activity Conditions - 1
Date Name
06/18/2018 ROADWAY IS UNDER A NO CUT PAVEMENT MORATORIUM, PAVEMENT CUTS ARE NOT PERMITTED WITHOUT PRIOR WRITTEN APPROVAL FROM TDOT.

Completed Inspections

Permit Status: Final
Permit Number: T18RW02727
Permit Description: EMERGENCY (2) 5 X 5 BELLHOLES IN BLKTOP FRONT-TO REPAIR/REPLACE GAS LINE-EMERGENCY--WORKED ON 06/07/2018 NPL TO DO BLKTOP REPAIR -PAVEMENT MORATORIUM- MILL AND INLAY REQUIRED 50 FEET EACH DIRECTION BEYOND REPAIR
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/01/2018 TDOT-EXCAV GENERAL INSPECTION DR Approved 100' Milled and Filled for moratorium. Final.

Documents

File Name Document Type  
T18RW02727.PDF ROW-RIGHT OF WAY VIEW
T18RW02727 R1.PDF ROW-RIGHT OF WAY VIEW