Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
05/23/2018
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
NO STREET EXCAVATION ONLY ALLEYWAY EXCAVATION. ALLEYWAYS BEHIND HOLLADAY STREET EXCAVATE/TRENCH 10'X4'X5' AREA TO REPAIR/REPLACE BROKEN SEWER PIPE ALLEYWAY TO BE A 24 HOUR CLOSURE.
Contractors:
  • PROPIPE PLUMBING AND ROOTER L L C

Completed Inspections

Permit Status: Final
Permit Number: T18RW02368
Permit Description: NO STREET EXCAVATION ONLY ALLEYWAY EXCAVATION. ALLEYWAYS BEHIND HOLLADAY STREET EXCAVATE/TRENCH 10'X4'X5' AREA TO REPAIR/REPLACE BROKEN SEWER PIPE ALLEYWAY TO BE A 24 HOUR CLOSURE.
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/26/2018 TDOT-EXCAV GENERAL INSPECTION cfarren Approved pre con - they want to start on thursday and also have the alley closed on friday - i told them to check with trash to see when trash pick up is - CN

Documents

File Name Document Type  
T18RW02368.PDF ROW-RIGHT OF WAY VIEW