Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
1449 N CHERRY AV
Address NEW:
1449 N CHERRY AV
Apply Date:
05/09/2018
Applicant:
SOUTHWEST GAS
Description:
Trench in pavement 30' of 12" steel pipe on Cherry Ave at Drachman St - work to occur at night. Trench in pavement 20' of 12" steel pipe on Cherry Ave between Enke Dr and 4th St - daytime work. Trench in pavement 80' of 8" steel pipe on Lester St at Warren Ave - daytime work. (1) 5'x5' bellhole in pavement at northwest corner of Lester St and Warren Ave for pipe maintenance - daytime work. (1) 5'x5' bellhole on 4th St near Cherry Ave for pipe maintenance - daytime work. ADDRESS LISTED ON APPLICATION-1335 N CHERRY AV NOISE EXCEEDING 62 DB REQUIRES NOISE EXEMPTION PERMIT 06/06/2018-PLAN CHANGE Trench in pavement 130' of 8" steel pipe on Lester St at Warren Ave intersection. Installation is joint trench. Closure of Warren Ave south of Lester St to use as material staging area, see TCP.

Completed Inspections

Permit Status: Final
Permit Number: T18RW02144
Permit Description: Trench in pavement 30' of 12" steel pipe on Cherry Ave at Drachman St - work to occur at night. Trench in pavement 20' of 12" steel pipe on Cherry Ave between Enke Dr and 4th St - daytime work. Trench in pavement 80' of 8" steel pipe on Lester St at Warren Ave - daytime work. (1) 5'x5' bellhole in pavement at northwest corner of Lester St and Warren Ave for pipe maintenance - daytime work. (1) 5'x5' bellhole on 4th St near Cherry Ave for pipe maintenance - daytime work. ADDRESS LISTED ON APPLICATION-1335 N CHERRY AV NOISE EXCEEDING 62 DB REQUIRES NOISE EXEMPTION PERMIT 06/06/2018-PLAN CHANGE Trench in pavement 130' of 8" steel pipe on Lester St at Warren Ave intersection. Installation is joint trench. Closure of Warren Ave south of Lester St to use as material staging area, see TCP.
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/21/2018 TDOT-EXCAV GENERAL INSPECTION DR Approved Final. No Issues.

Documents

File Name Document Type  
T18RW02144.PDF ROW-RIGHT OF WAY VIEW
T18RW02144 R1.PDF ROW-RIGHT OF WAY VIEW
T18RW02144 R2.PDF ROW-RIGHT OF WAY VIEW