Permit: T18RW01301
Permit Details
Apply Date:
03/16/2018
Applicant:
CANYON BUILDING AND DESIGN LLC *APA*
Description:
BORING UNDER TROLLEY TRACKS TO CONNECT TO SEWER MAIN TIE INTO TEP VAULT TEMPORARY NOISE EXEMPTION IS FOR WORK OF MARCH 18, 19 AND 20, 2018; WORK COMMENCES AT 9:00AM AND CONTINUES UNTIL THE FOLLOWING MORNING AT 7:00AM 03/21/2018-PLAN CHANGE-TEMP NOISE EXEMPT AND SUNLINK- TEMP NOISE EXEMPT-WORK DATES MARCH 25,26 & 27, 2018 AND APRIL 1, 2, 3, 2018 SUNLINK POWER DOWN FOR MARCH 25, 26, 27, 2018-ONLY START AT 11PM AND END 7AM EACH FOLLOWING DAY 4/16/18 WORK DESCRIPTION CHANGE: MILL/REPAVE ASPHALT ON CONGRESS ST (50' EAST AND WEST OF EXCAVATED AREA FOR ALL AFFECTED TRAVEL LANES) 05/02/2018-PLAN CHANGE SUNLINK APPROVED POWER DOWN FOR THE FOLLOWING DATES: MAY 6-9, MAY 13-16-MAY 20-23 MTW 11:00PM SUN 9PM
Outstanding Inspections
Permit Status: Final
Permit Number: T18RW01301
Permite Description: BORING UNDER TROLLEY TRACKS TO CONNECT TO SEWER MAIN
TIE INTO TEP VAULT
TEMPORARY NOISE EXEMPTION IS FOR WORK OF MARCH 18, 19 AND 20, 2018; WORK COMMENCES AT 9:00AM AND CONTINUES UNTIL THE FOLLOWING MORNING AT 7:00AM
03/21/2018-PLAN CHANGE-TEMP NOISE EXEMPT AND SUNLINK-
TEMP NOISE EXEMPT-WORK DATES MARCH 25,26 & 27, 2018 AND APRIL 1, 2, 3, 2018
SUNLINK POWER DOWN FOR MARCH 25, 26, 27, 2018-ONLY
START AT 11PM AND END 7AM EACH FOLLOWING DAY
4/16/18 WORK DESCRIPTION CHANGE:
MILL/REPAVE ASPHALT ON CONGRESS ST (50' EAST AND WEST OF EXCAVATED AREA FOR ALL AFFECTED TRAVEL LANES)
05/02/2018-PLAN CHANGE
SUNLINK APPROVED POWER DOWN FOR THE FOLLOWING DATES:
MAY 6-9, MAY 13-16-MAY 20-23
MTW 11:00PM SUN 9PM
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/12/2018 | TDOT-Routine Barricade Inspect | N/A | Continued | Checked with site superintendent at 8:30 am to assure that Scott Ave. will be accessible for evening events. Still not ready at 11:00 am. Informed Inspector Cazares to follow up later today. |
Completed Inspections
Permit Status: Final
Permit Number: T18RW01301
Permit Description: BORING UNDER TROLLEY TRACKS TO CONNECT TO SEWER MAIN
TIE INTO TEP VAULT
TEMPORARY NOISE EXEMPTION IS FOR WORK OF MARCH 18, 19 AND 20, 2018; WORK COMMENCES AT 9:00AM AND CONTINUES UNTIL THE FOLLOWING MORNING AT 7:00AM
03/21/2018-PLAN CHANGE-TEMP NOISE EXEMPT AND SUNLINK-
TEMP NOISE EXEMPT-WORK DATES MARCH 25,26 & 27, 2018 AND APRIL 1, 2, 3, 2018
SUNLINK POWER DOWN FOR MARCH 25, 26, 27, 2018-ONLY
START AT 11PM AND END 7AM EACH FOLLOWING DAY
4/16/18 WORK DESCRIPTION CHANGE:
MILL/REPAVE ASPHALT ON CONGRESS ST (50' EAST AND WEST OF EXCAVATED AREA FOR ALL AFFECTED TRAVEL LANES)
05/02/2018-PLAN CHANGE
SUNLINK APPROVED POWER DOWN FOR THE FOLLOWING DATES:
MAY 6-9, MAY 13-16-MAY 20-23
MTW 11:00PM SUN 9PM
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/03/2018 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Paving complete. Rest of site work under T18RW02238 |