Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
03/05/2018
Applicant:
SOUTHWEST GAS
Description:
0059 VSP - REPLACE 12870 LF OF NATURAL GAS LINES. 3357 LF VIA TRENCHING/BORING IN PAVEMENT; 9513 LF VIA TRENCHING/BORING IN DIRT PER ATTACHED SWG DESIGN. TCPS ATTACHED. ADDRESS ON APPLICATION-2357 S CAMPBELL AV; SEE LIST OF VARIOUS ADDRESSES 03/20/2018-PLAN CHANGE-TWO CONTRACTORS TO PERMIT
Contractors:
  • R DIRECTIONAL DRILLING & UNDERGROUND TECHNOLOGY
  • TEAM FISHEL
  • UNDERGROUND CONSTRUCTION CO INC

Completed Inspections

Permit Status: Final
Permit Number: T18RW01058
Permit Description: 0059 VSP - REPLACE 12870 LF OF NATURAL GAS LINES. 3357 LF VIA TRENCHING/BORING IN PAVEMENT; 9513 LF VIA TRENCHING/BORING IN DIRT PER ATTACHED SWG DESIGN. TCPS ATTACHED. ADDRESS ON APPLICATION-2357 S CAMPBELL AV; SEE LIST OF VARIOUS ADDRESSES 03/20/2018-PLAN CHANGE-TWO CONTRACTORS TO PERMIT
Total Completed Inspections - 1
Date Description Inspector Results Comments
12/04/2018 TDOT-EXCAV GENERAL INSPECTION cfarren Approved contractor working along bristol and 23rd - CN

Documents

File Name Document Type  
T18RW01058.PDF ROW-RIGHT OF WAY VIEW
T18RW01058 R1.PDF ROW-RIGHT OF WAY VIEW
T18RW01058 R2.PDF ROW-RIGHT OF WAY VIEW
T18RW01058 R3.PDF ROW-RIGHT OF WAY VIEW
T18RW01058 R4.PDF ROW-RIGHT OF WAY VIEW