Permit Details

Status:
Final
Type:
Barricade Only
Apply Date:
02/26/2018
Applicant:
COX COMMUNICATIONS
Description:
Starting on the S/W corner of E. Fort Lowell Rd and N. Alvernon Way overlash 135' going east continuing North for 605' then East 305' riser down pole and pull through existing pipe going South 15' to OUT OF ROW. Also, conintuing from the SE corner of E Farr and N Alvernon at TEP pole, overlash going NW to out of ROW. 03/21/2018-PLAN CHANGE NEW: Starting on the S/W corner of E. Fort Lowell Rd and N. Alvernon Way Overlash 135' going east continuing North for 605' then East 305' riser down pole and pull through existing pipe going South 15' to OUT OF ROW Continuing job from the N/W corner of E. Farr and N. Alvernon Way at Cox existing Power supply Trench / Bore West 3' setting new pad, continue Trench 3' west placing a 3x3x3 pot hole for new Vault then South 3' continue trench/bore East 20' then N/E 36' then North 113' Continue trench /Bore East 90' to TEP pole, Riser up pole Tie In
Contractors:
  • ALPHA UNDERGROUND CONSTRUCTION CO INC *APA
  • FLASH IT BARRICADES LLC
  • TRUENET COMMUNICATIONS CORP

Completed Inspections

Permit Status: Final
Permit Number: T18RW00957
Permit Description: Starting on the S/W corner of E. Fort Lowell Rd and N. Alvernon Way overlash 135' going east continuing North for 605' then East 305' riser down pole and pull through existing pipe going South 15' to OUT OF ROW. Also, conintuing from the SE corner of E Farr and N Alvernon at TEP pole, overlash going NW to out of ROW. 03/21/2018-PLAN CHANGE NEW: Starting on the S/W corner of E. Fort Lowell Rd and N. Alvernon Way Overlash 135' going east continuing North for 605' then East 305' riser down pole and pull through existing pipe going South 15' to OUT OF ROW Continuing job from the N/W corner of E. Farr and N. Alvernon Way at Cox existing Power supply Trench / Bore West 3' setting new pad, continue Trench 3' west placing a 3x3x3 pot hole for new Vault then South 3' continue trench/bore East 20' then N/E 36' then North 113' Continue trench /Bore East 90' to TEP pole, Riser up pole Tie In
Total Completed Inspections - 1
Date Description Inspector Results Comments
05/10/2018 TDOT-EXCAV GENERAL INSPECTION JC Approved Saw no activity.

Documents

File Name Document Type  
T18RW00957.PDF ROW-RIGHT OF WAY VIEW
T18RW00957 R1.PDF ROW-RIGHT OF WAY VIEW