Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18RW00957
Permit Details
Apply Date:
02/26/2018
Applicant:
COX COMMUNICATIONS
Description:
Starting on the S/W corner of E. Fort Lowell Rd and N. Alvernon Way overlash 135' going east continuing North for 605' then East 305' riser down pole and pull through existing pipe going South 15' to OUT OF ROW. Also, conintuing from the SE corner of E Farr and N Alvernon at TEP pole, overlash going NW to out of ROW. 03/21/2018-PLAN CHANGE NEW: Starting on the S/W corner of E. Fort Lowell Rd and N. Alvernon Way Overlash 135' going east continuing North for 605' then East 305' riser down pole and pull through existing pipe going South 15' to OUT OF ROW Continuing job from the N/W corner of E. Farr and N. Alvernon Way at Cox existing Power supply Trench / Bore West 3' setting new pad, continue Trench 3' west placing a 3x3x3 pot hole for new Vault then South 3' continue trench/bore East 20' then N/E 36' then North 113' Continue trench /Bore East 90' to TEP pole, Riser up pole Tie In
Contractors:
- ALPHA UNDERGROUND CONSTRUCTION CO INC *APA
- FLASH IT BARRICADES LLC
- TRUENET COMMUNICATIONS CORP
Completed Inspections
Permit Status: Final
Permit Number: T18RW00957
Permit Description: Starting on the S/W corner of E. Fort Lowell Rd and N. Alvernon Way overlash 135' going east continuing North for 605' then East 305' riser down pole and pull through existing pipe going South 15' to OUT OF ROW. Also, conintuing from the SE corner of E Farr and N Alvernon at TEP pole, overlash going NW to out of ROW.
03/21/2018-PLAN CHANGE
NEW: Starting on the S/W corner of E. Fort Lowell Rd and N. Alvernon Way Overlash 135' going east continuing North for 605' then East 305' riser down pole and pull through existing pipe going South 15' to OUT OF ROW
Continuing job from the N/W corner of E. Farr and N. Alvernon Way at Cox existing Power supply Trench / Bore West 3' setting new pad, continue Trench 3' west placing a 3x3x3 pot hole for new Vault then South 3' continue trench/bore East 20' then N/E 36' then North 113' Continue trench /Bore East 90' to TEP pole, Riser up pole Tie In
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/10/2018 | TDOT-EXCAV GENERAL INSPECTION | JC | Approved | Saw no activity. |