Permit: T18RW00815
Permit Details
Apply Date:
02/16/2018
Applicant:
CANYON BUILDING AND DESIGN LLC *APA*
Description:
SAW CUTTING/POTHOLING FOR LOCATION OF EXISTING UTILTY LINE, EXCAVATION/PAVING, SIDEWALK DEMO AND REPLACE, SEWER TAP, BCS, TEP PRIMARY LINE. SUNLINK-PLEASE BE ADVISED THAT THIS PERMIT REQUEST IS AN EXTENSION OF THE PREVIOUS PERMIT #032017-02 NOISE EXEMPTION REQUEST FOR FEBRUARY 18 THRU 21ST FOR TEP WORK AND CORE DRILLING THEIR VAULT. WE ARE ALSO VERIFYING THE SEWER TO TAP AND BORE DRILL UNDER THE TROLLEY DURING THESE TIMES. WE WILL START AT 11PM AND WORK UNTIL 7AM EACH DAY.
Completed Inspections
Permit Status: Final
Permit Number: T18RW00815
Permit Description: SAW CUTTING/POTHOLING FOR LOCATION OF EXISTING UTILTY LINE, EXCAVATION/PAVING, SIDEWALK DEMO AND REPLACE, SEWER TAP, BCS, TEP PRIMARY LINE.
SUNLINK-PLEASE BE ADVISED THAT THIS PERMIT REQUEST IS AN EXTENSION OF THE PREVIOUS PERMIT #032017-02
NOISE EXEMPTION REQUEST FOR FEBRUARY 18 THRU 21ST FOR TEP WORK AND CORE DRILLING THEIR VAULT. WE ARE ALSO VERIFYING THE SEWER TO TAP AND BORE DRILL UNDER THE TROLLEY DURING THESE TIMES. WE WILL START AT 11PM AND WORK UNTIL 7AM EACH DAY.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2018 | TDOT-Routine Barricade Inspect | Adan Gomez | Approved |