Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18RW00334
Permit Details
Apply Date:
01/18/2018
Applicant:
R.E. LEE MECHANICAL INC
Description:
INSTALLATION OF (2) 8" CHILLED WATER LINES FROM 33 N STONE TO THE WEST ENTRANCE OF 32 N STONE. WORK WILL B E COMPLETED BETWEEN 7 PM AND 6 AM, MONDAY THRU FRIDAY EXCLUDING PRESIDENTS DAY, FEB 19. THERE WILL ALSO BE SAWCUTTING ON SATURDAY AND SUNDAY, FEB 10 AND 11, ACROSS STONE FROM 6 AM TO 6 PM. 1/29/18 WORK DESCRIPTION ADDITION: STONE AVE HAS A +/- 10" CONCRETE SUB BASE PAVEMENT STRUCTURAL SECTION AND WILL REQUIRE A PAVEMENT PATCH REPAIR PER PAG STANDARD DETAIL 216 TYPE 3. 4/4/18 WORK DESCRIPTION ADDITION: LAY DOWN ASPHALT PATCH ON STONE CROSSING SOUTH OF PENNINGTON ST BETWEEN 9A - 3:30P ON APRIL 12 AND 13
Contractors:
- STRUNK EXCAVATING INC , R W
Completed Inspections
Permit Status: Final
Permit Number: T18RW00334
Permit Description: INSTALLATION OF (2) 8" CHILLED WATER LINES FROM 33 N STONE TO THE WEST ENTRANCE OF 32 N STONE. WORK WILL B E COMPLETED BETWEEN 7 PM AND 6 AM, MONDAY THRU FRIDAY EXCLUDING PRESIDENTS DAY, FEB 19. THERE WILL ALSO BE SAWCUTTING ON SATURDAY AND SUNDAY, FEB 10 AND 11, ACROSS STONE FROM 6 AM TO 6 PM.
1/29/18 WORK DESCRIPTION ADDITION:
STONE AVE HAS A +/- 10" CONCRETE SUB BASE PAVEMENT STRUCTURAL SECTION AND WILL REQUIRE A PAVEMENT PATCH REPAIR PER PAG STANDARD DETAIL 216 TYPE 3.
4/4/18 WORK DESCRIPTION ADDITION:
LAY DOWN ASPHALT PATCH ON STONE CROSSING SOUTH OF PENNINGTON ST BETWEEN 9A - 3:30P ON APRIL 12 AND 13
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/14/2018 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Final. |