Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18RW00029
Permit Details
Apply Date:
01/02/2018
Applicant:
N/A
Description:
OFF-SITE IMPROVEMENTS FOR VALENCIA/HEADLEY COMERCIAN PROPERTY 01/09/2018-PLAN CHANGE Minor changes to the traffic control plan are as follows: 1) We extended the pedestrian walkway further to the West, to get it out of conflict with the barrier wall. 2) We added a “No U-Turn” sign to West-bound Valencia (not enough room to make the u-turn with a long vehicle if we close the outside lane. 3) We wrapped the pedestrian walkway on the East end around Headley to utilize the existing crosswalk. 02/12/2018-PLAN CHANGE REQUESTED MODIFICATION OF SHOULDER CLOSURE TO BE IN PLACE DURING MEDIAN WORK. 24 HOUR SHOULDER; 9-3:30 MEDIAN WORK. 03/16/2018-PLAN CHANGE Revised Traffic Control Plan is attached. Changes include lights on all barricades, and permission to leave the West-bound median lane closure up 24-hours, and the East-bound median lane closure up during daytime only (9:00am-3:30pm). These changes have been discussed with out field PIA inspector.
Contractors:
- ARROW STRIPING INC ,
- EAGLE ROCK EXCAVATING L L C
Completed Inspections
Permit Status: Final
Permit Number: T18RW00029
Permit Description: OFF-SITE IMPROVEMENTS FOR VALENCIA/HEADLEY COMERCIAN PROPERTY
01/09/2018-PLAN CHANGE
Minor changes to the traffic control plan are as follows:
1) We extended the pedestrian walkway further to the West, to get it out of conflict with the barrier wall.
2) We added a “No U-Turn” sign to West-bound Valencia (not enough room to make the u-turn with a long vehicle if we close the outside lane.
3) We wrapped the pedestrian walkway on the East end around Headley to utilize the existing crosswalk.
02/12/2018-PLAN CHANGE
REQUESTED MODIFICATION OF SHOULDER CLOSURE TO BE IN PLACE DURING MEDIAN WORK. 24 HOUR SHOULDER; 9-3:30 MEDIAN WORK.
03/16/2018-PLAN CHANGE
Revised Traffic Control Plan is attached. Changes include lights on all barricades, and permission to leave the West-bound median lane closure up 24-hours, and the East-bound median lane closure up during daytime only (9:00am-3:30pm). These changes have been discussed with out field PIA inspector.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/14/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | work completed as a PIA by Mike Bravin, Final acceptance approved |