Permit Details

Status:
Final
Type:
Barricade Only
Apply Date:
01/02/2018
Applicant:
N/A
Description:
OFF-SITE IMPROVEMENTS FOR VALENCIA/HEADLEY COMERCIAN PROPERTY 01/09/2018-PLAN CHANGE Minor changes to the traffic control plan are as follows: 1) We extended the pedestrian walkway further to the West, to get it out of conflict with the barrier wall. 2) We added a “No U-Turn” sign to West-bound Valencia (not enough room to make the u-turn with a long vehicle if we close the outside lane. 3) We wrapped the pedestrian walkway on the East end around Headley to utilize the existing crosswalk. 02/12/2018-PLAN CHANGE REQUESTED MODIFICATION OF SHOULDER CLOSURE TO BE IN PLACE DURING MEDIAN WORK. 24 HOUR SHOULDER; 9-3:30 MEDIAN WORK. 03/16/2018-PLAN CHANGE Revised Traffic Control Plan is attached. Changes include lights on all barricades, and permission to leave the West-bound median lane closure up 24-hours, and the East-bound median lane closure up during daytime only (9:00am-3:30pm). These changes have been discussed with out field PIA inspector.
Contractors:
  • ARROW STRIPING INC ,
  • EAGLE ROCK EXCAVATING L L C

Completed Inspections

Permit Status: Final
Permit Number: T18RW00029
Permit Description: OFF-SITE IMPROVEMENTS FOR VALENCIA/HEADLEY COMERCIAN PROPERTY 01/09/2018-PLAN CHANGE Minor changes to the traffic control plan are as follows: 1) We extended the pedestrian walkway further to the West, to get it out of conflict with the barrier wall. 2) We added a “No U-Turn” sign to West-bound Valencia (not enough room to make the u-turn with a long vehicle if we close the outside lane. 3) We wrapped the pedestrian walkway on the East end around Headley to utilize the existing crosswalk. 02/12/2018-PLAN CHANGE REQUESTED MODIFICATION OF SHOULDER CLOSURE TO BE IN PLACE DURING MEDIAN WORK. 24 HOUR SHOULDER; 9-3:30 MEDIAN WORK. 03/16/2018-PLAN CHANGE Revised Traffic Control Plan is attached. Changes include lights on all barricades, and permission to leave the West-bound median lane closure up 24-hours, and the East-bound median lane closure up during daytime only (9:00am-3:30pm). These changes have been discussed with out field PIA inspector.
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/14/2019 TDOT-EXCAV GENERAL INSPECTION Bravin Approved work completed as a PIA by Mike Bravin, Final acceptance approved

Documents

File Name Document Type  
T18RW00029.PDF ROW-RIGHT OF WAY VIEW
T18RW00029 R1.PDF ROW-RIGHT OF WAY VIEW
T18RW00029 R2.PDF ROW-RIGHT OF WAY VIEW
T18RW00029 R3.PDF ROW-RIGHT OF WAY VIEW
T18RW00029 R4.PDF ROW-RIGHT OF WAY VIEW