Permit: T18OT00779
Permit Details
Apply Date:
07/19/2018
Applicant:
ARIZONA COMMERCIAL SIGNS
Description:
1-ILLUM WALL SIGN
Completed Inspections
Permit Status: Final
Permit Number: T18OT00779
Permit Description: 1-ILLUM WALL SIGN
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2018 | SIGN SITE REVIEW | BWIESE1 | Approved | This permit is ready to be paid for and picked up. Your stamped & issued sign permit must be on site during install. You can pick up your permit from 8am -11:30am at the Sign Desk 201 N Stone Ave, 1st floor, North side of building. In person you can pay, cash, check, or charge. |
| 11/01/2018 | SIGN INSPECTION | BBENEDON | Approved | there are no plans on site could not locate or identify the circuit breaker and time clock, I had no access to the sign disconnect switch. This is a clinic with heavy security. |
| 11/01/2018 | SIGN ELECTRIC | BBENEDON | Approved | provide a set of City approved plans for this project, i d the circuit breaker provide the time clock and access to the sign disconnect switch. |