Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18OT00522
Permit Details
Apply Date:
05/17/2018
Applicant:
Description:
FUP for DP18-0118
Permit Reviews
Permit Number - T18OT00522
Permit Status: Approved
Permit Description: FUP for DP18-0118
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/17/2018 | PLANS OK TO SUBMIT - FLOODPLAIN | 05/17/2018 | COMPLETED |
Conditions
Permit Number - T18OT00522
Permit Status: Approved
Permit Description: FUP for DP18-0118
Date | Description | Comments |
---|---|---|
05/17/2018 | Floodplain Use Permit T18OT00522May 17th, 2018 (No Elevation Certificate Required). The applicant is authorized to use a portion of the Special Flood Hazard Area (FEMA Zone A, Panel 1689L) in the City of Tucson at 3600 N Silverbell for the installation of 2 extraction wells associated pipelineThe applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations require the issuance of an additional Floodplain Use Permit.The following conditions shall apply to this permit:1. All work shall conform to the attached plans (DP18-0118) which are made part of this permit.2. The existing drainage patterns at the property lines shall not be obstructed or changed.3. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.4. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development.5. Any future development of the sight including patio walls to be constructed will require a separate Floodplain Use Permit.This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with. |