Permit Details

Status:
L of c
Type:
COMMERCIAL NEW
Apply Date:
12/20/2018
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
NEW SHELL
Contractors:
  • BARKER CONTRACTING INC **APA**

Permit Reviews

Permit Number - T18CM09898
Permit Status: L of c
Permit Description: NEW SHELL
Start Date Submittal Complete Date Status  
01/07/2019 3RD PARTY REVIEW - COMMERCIAL 01/25/2019 COMPLETED Review Details
01/25/2019 POST 3RD PARTY REVIEW 01/30/2019 COMPLETED Review Details
01/30/2019 POST 3RD PARTY REVIEW 01/31/2019 COMPLETED Review Details
05/07/2019 3RD PARTY REVIEW - REVISION/OTHER 05/07/2019 ACTIVE Review Details
12/20/2018 PLANS OK TO SUBMIT - COMM 12/21/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM09898
Permit Status: L of c
Permit Description: NEW SHELL
Total Outstanding Activity Conditions - 1
Date Name
12/20/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: L of c
Permit Number: T18CM09898
Permit Description: NEW SHELL
Total Completed Inspections - 39
Date Description Inspector Results Comments
02/14/2019 PLUMBING - SEWER HCS CONNECT MHASSAN Approved
02/14/2019 PLUMBING - ROUGH, SOIL MHASSAN Approved
02/20/2019 ELECTRIC - UNDERGROUND MHASSAN Approved
03/05/2019 ELECTRIC - UFER MHASSAN Approved
03/05/2019 BUILDING PRE-SLAB MHASSAN Approved
04/23/2019 ROOF NAILING MHASSAN Approved
04/23/2019 EXT METAL CLIPS/EXT SHEATHING MHASSAN Approved finish screwing off sheer walls at bottom track and missed areas on west wall.
05/15/2019 FRAMING RCAMACHO Approved
05/30/2019 SHEET ROCK NAILING MHASSAN Approved approval is for one siding of the demising wall, the TI will be responsible for the other side.
06/03/2019 PLUMBING - ROOF DRAINS MHASSAN Approved make sure to use correct approved strapping for supporting the PVC pipes. Water test ok
06/24/2019 NPPO - FINAL BBENEDON Approved
06/24/2019 MECHANICAL - FINAL MHASSAN Approved shell only permit, mechanical will be run on TI permits.
06/24/2019 MECHANICAL - ABOVE CEILING MHASSAN Approved shell only permit, mechanical will be run on TI permits.
06/24/2019 MECHANICAL - INTERMEDIATE MHASSAN Approved approval is for curbs and pathways only as this is a shell only permit.
06/24/2019 PLUMBING - FINAL MHASSAN Approved approval is for plumbing into the building only as this is a shell only permit.
06/24/2019 PLUMBING - INTERMEDIATE MHASSAN Approved approval is for plumbing into the building only as this is a shell only permit.
06/24/2019 ELECTRIC - ABOVE CEILING MHASSAN Approved approval is for future use conduit up to mechanical units only as this is a shell only permit.
06/24/2019 STUCCO MESH MHASSAN Approved
06/24/2019 BUILDING ABOVE CEILING MHASSAN Approved approval is only for water and future use conduit in the ceiling as this is a shell only permit.
06/24/2019 STEM WALL/RETAINING WALL MHASSAN Approved
06/24/2019 EXCAVATION/LAYOUT REBAR & ZON MHASSAN Approved
06/24/2019 RIGHT OF WAY - FINAL Bravin Approved No Right of way work needed
06/27/2019 TEP CLEARANCE - PM RCAMACHO Approved Suite 100 & house panel CODE ECO
06/27/2019 ELECTRIC - CABLE DROP RCAMACHO Approved ECO
Suite 100 & house panel
To remain locked out/tagged out
07/11/2019 ELECTRIC - OUTDOOR LIGHTING DQUINN Approved APPROVED PER 2090 APPROVAL
07/11/2019 ELECTRIC - INTERMEDIATE DQUINN Approved
07/11/2019 ELECTRIC - FINAL DQUINN Approved
07/12/2019 U VALUE FOR WINDOW TVALENCIA Approved
07/12/2019 LANDSCAPE - FINAL BBENEDON Approved
07/12/2019 SIGN - FINAL BBENEDON Approved
07/16/2019 FIRE - ALARM FINAL JPEELDAVIS Approved
07/22/2019 ENGINEERING - FINAL BBENEDON Approved
07/24/2019 FIRE - FINAL gsereno1 Approved
07/24/2019 FIRE - FINAL JPEELDAVIS Approved Need to lock keys in KNOX box and FDC cap
07/24/2019 FIRE SPKLR - FINAL JPEELDAVIS Approved
08/13/2019 ZONING - FINAL AHINES2 Approved Verified SF is consistent with DP16-0044 signed 7/25/19.
09/10/2019 REINFORCED MASONRY PRE-GROUT TVALENCIA Approved
09/10/2019 BUILDING - FINAL TVALENCIA Approved
09/10/2019 BUILDING - FINAL DROBERTS Approved

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
001_A1.TIF CONSTRPLANS VIEW
002_A2.TIF CONSTRPLANS VIEW
003_A3.TIF CONSTRPLANS VIEW
004_A4.TIF CONSTRPLANS VIEW
005_A5.TIF CONSTRPLANS VIEW
006_A6.TIF CONSTRPLANS VIEW
007_A7.TIF CONSTRPLANS VIEW
008_A8.TIF CONSTRPLANS VIEW
009_A9.TIF CONSTRPLANS VIEW
010_S0.1.TIF CONSTRPLANS VIEW
011_S0.2.TIF CONSTRPLANS VIEW
012_S1.1.TIF CONSTRPLANS VIEW
013_S2.1.TIF CONSTRPLANS VIEW
014_S3.1.TIF CONSTRPLANS VIEW
015_S3.1.TIF CONSTRPLANS VIEW
016_S4.1.TIF CONSTRPLANS VIEW
017_S4.2.TIF CONSTRPLANS VIEW
018_MP1.0.TIF CONSTRPLANS VIEW
019_MP2.0.TIF CONSTRPLANS VIEW
021_ES.1.TIF CONSTRPLANS VIEW
022_E0.1.TIF CONSTRPLANS VIEW
023_E1.0.TIF CONSTRPLANS VIEW
024_E2.0.TIF CONSTRPLANS VIEW
025_E3.0.TIF CONSTRPLANS VIEW
026_SHEET 1 OF 4.TIF CONSTRPLANS VIEW
027_SHEET 2 OF 4.TIF CONSTRPLANS VIEW
028_SHEET 3 OF 4.TIF CONSTRPLANS VIEW
029_SHEET 4 OF 4.TIF CONSTRPLANS VIEW
001_SHEET 1 OF 1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW
T18CM09898 WATER REPORT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW