Permit: T18CM09404
Permit Details
Apply Date:
11/30/2018
Applicant:
Declan Murphy
Description:
VERIZON CELL TOWER
Permit Reviews
Permit Number - T18CM09404
Permit Status: Inspections complete
Permit Description: VERIZON CELL TOWER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/14/2019 | CELL TOWER/ANTENNAS | 05/10/2019 | COMPLETED |
05/10/2019 | CELL TOWER/ANTENNAS | 05/10/2019 | ACTIVE |
11/30/2018 | CELL TOWER/ANTENNAS | 11/30/2018 | COMPLETED |
11/30/2018 | CELL TOWER/ANTENNAS | 02/14/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM09404
Permit Status: Inspections complete
Permit Description: VERIZON CELL TOWER
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
11/30/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
12/10/2018 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
12/10/2018 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
12/10/2018 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
12/10/2018 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: T18CM09404
Permit Description: VERIZON CELL TOWER
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2019 | COT - LCEL - Electrical Underground | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } | |
06/26/2019 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } | |
08/23/2019 | COT - LCBU - Building Final | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - } | |
08/23/2019 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - } | |
08/23/2019 | COT - LCEL - Construction Power | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - } | |
08/23/2019 | COT - LCEL - Electrical Final | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - Clearance: Ok to energize cell tower. Code: DGC. } |
|
08/23/2019 | COT - LCEL - Temporary Service | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - } | |
08/23/2019 | BULD - Electrical Clearance | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - CODE DGC} | |
08/23/2019 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/11/2019; Status: Denied; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - Concrete poured before inspection.} ; {Activity date: 06/21/2019; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by DMERANZ1 - Retaining wall and CMU walls at 8"-56" (first lift). Ok to top out walls at 8’ with clean-outs. Ok to place grout.} |