Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18CM08839
Permit Details
Apply Date:
11/06/2018
Applicant:
BRIAN HAGEDON
Description:
SHELL BUILD OUT, LVL 3 PACU, TOWER 4 LVL 3 AND 9
Architects:
- WATSON, ANGELA
Contractors:
- D P R CONSTRUCTION A GENERAL PARTNERSHIP
Outstanding Activity Conditions
Permit Number - T18CM08839
Permit Status: Withdrwn
Permit Description: SHELL BUILD OUT, LVL 3 PACU, TOWER 4 LVL 3 AND 9
Total Outstanding Activity Conditions - 12
Date | Name |
---|---|
11/06/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
11/06/2018 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. |
11/06/2018 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
11/06/2018 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
11/06/2018 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
11/06/2018 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |
11/06/2018 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
11/06/2018 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
11/06/2018 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
11/06/2018 | SPECIAL INSPECTION FOR SPRAY-APPLIED FIRE PROOFING IS REQUIRED. |
11/06/2018 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
11/06/2018 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: T18CM08839
Permite Description: SHELL BUILD OUT, LVL 3 PACU, TOWER 4 LVL 3 AND 9
Total Outstanding Inspections - 43
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
EXCAVATION/LAYOUT REBAR & ZON | N/A | Not Inspected | ||
REINFORCED MASONRY PRE-GROUT | N/A | Not Inspected | ||
FRAMING | N/A | Not Inspected | ||
BUILDING ABOVE CEILING | N/A | Not Inspected | ||
STUCCO MESH | N/A | Not Inspected | ||
U VALUE FOR WINDOW | N/A | Not Inspected | ||
FIREWALL/FIREBARRIER/FIRESTOP | N/A | Not Inspected | ||
SHEET ROCK NAILING | N/A | Not Inspected | ||
BUILDING - PROGRESS | N/A | Not Inspected | ||
BUILDING - FINAL | N/A | Not Inspected | ||
ELECTRIC - UFER | N/A | Not Inspected | ||
ELECTRIC - UNDERGROUND | N/A | Not Inspected | ||
ELECTRIC - INTERMEDIATE | N/A | Not Inspected | ||
ELECTRIC - ABOVE CEILING | N/A | Not Inspected | ||
ELECTRIC - TEMPORARY SERVICE | N/A | Not Inspected | ||
ELECTRIC - CONSTRUCTION POWER | N/A | Not Inspected | ||
ELECTRIC - TEMP POWER FOR TEST | N/A | Not Inspected | ||
ELECTRIC - PROGRESS | N/A | Not Inspected | ||
ELECTRIC - FINAL | N/A | Not Inspected | ||
OUTDOOR LIGHTING FINAL | N/A | Not Inspected | ||
PLUMBING - ROUGH, SOIL | N/A | Not Inspected | ||
PLUMBING - INTERMEDIATE | N/A | Not Inspected | ||
PLUMBING - ABOVE CEILING | N/A | Not Inspected | ||
PLUMBING - ROOF DRAINS | N/A | Not Inspected | ||
PLUMBING - YARD WTR LINE/TEST | N/A | Not Inspected | ||
PLUMBING - MD GAS/PRECONST MTG | N/A | Not Inspected | ||
PLUMBING - MEDICAL GAS/TEST | N/A | Not Inspected | ||
PLUMBING - GAS PRESSURE TEST | N/A | Not Inspected | ||
SITE - SEWER | N/A | Not Inspected | ||
PLUMBING - PROGRESS | N/A | Not Inspected | ||
PLUMBING - MEDICAL GAS/FINAL | N/A | Not Inspected | ||
PLUMBING - FINAL | N/A | Not Inspected | ||
MECHANICAL - INTERMEDIATE | N/A | Not Inspected | ||
MECHANICAL - ABOVE CEILING | N/A | Not Inspected | ||
MECHANICAL - HOODS | N/A | Not Inspected | ||
MECHANICAL - FINAL | N/A | Not Inspected | ||
FIRE - FINAL | N/A | Not Inspected | ||
ENGINEERING - FINAL | N/A | Not Inspected | ||
LANDSCAPE - FINAL | N/A | Not Inspected | ||
HEALTH DEPT - FINAL 724-7908 | N/A | Not Inspected | ||
SIGN - FINAL | N/A | Not Inspected | ||
NPPO - FINAL | N/A | Not Inspected | ||
RIGHT OF WAY - FINAL | N/A | Not Inspected |