Permit: T18CM08710
Permit Details
Apply Date:
10/31/2018
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
NEW SHELL BLDG
Architects:
- GARCIA DAVID V
Contractors:
- BARKER CONTRACTING INC **APA**
Permit Reviews
Permit Number - T18CM08710
Permit Status: L of c
Permit Description: NEW SHELL BLDG
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/25/2019 | 3RD PARTY REVIEW - REVISION/OTHER | 01/25/2019 | COMPLETED |
02/21/2019 | 3RD PARTY REVIEW - REVISION/OTHER | 02/21/2019 | ACTIVE |
02/21/2019 | 3RD PARTY REVIEW - REVISION/OTHER-2ND | 03/07/2019 | COMPLETED |
10/31/2018 | PLANS OK TO SUBMIT - COMM | 10/31/2018 | COMPLETED |
12/04/2018 | 3RD PARTY REVIEW - COMMERCIAL | 12/14/2018 | COMPLETED |
12/14/2018 | POST 3RD PARTY REVIEW | 01/25/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM08710
Permit Status: L of c
Permit Description: NEW SHELL BLDG
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/31/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: L of c
Permit Number: T18CM08710
Permit Description: NEW SHELL BLDG
Total Completed Inspections - 40
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/15/2019 | PLUMBING - ROUGH, SOIL | RCAMACHO | Approved | |
01/24/2019 | PLUMBING - PRE SLAB | MHASSAN | Approved | underground plumbing will not get covered with concrete at this point because it is just a shell permit |
01/24/2019 | BUILDING PRE-SLAB | MHASSAN | Approved | |
01/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN | Approved | |
04/03/2019 | ROOF NAILING | MHASSAN | Approved | finish bracing between trusses |
04/05/2019 | PLUMBING - YARD WTR LINE/TEST | MHASSAN | Approved | |
04/05/2019 | PLUMBING - ROOF DRAINS | MHASSAN | Approved | add strap at Northwest corner |
04/05/2019 | ELECTRIC - UNDERGROUND | MHASSAN | Approved | |
05/14/2019 | PLUMBING - INTERMEDIATE | RCAMACHO | Approved | |
05/14/2019 | SHEET ROCK NAILING | RCAMACHO | Approved | |
05/14/2019 | BUILDING ABOVE CEILING | RCAMACHO | Approved | |
05/14/2019 | FRAMING | RCAMACHO | Approved | |
05/14/2019 | EXT METAL CLIPS/EXT SHEATHING | RCAMACHO | Approved | |
05/20/2019 | TEP CLEARANCE - PM | MHASSAN | Approved | CODE ECO |
05/20/2019 | ELECTRIC - CABLE DROP | MHASSAN | Approved | OK to clear electric ECO |
06/11/2019 | NPPO - FINAL | BBENEDON | Approved | Landscaping installed by borderland under DEP permit |
06/11/2019 | SIGN - FINAL | BBENEDON | Approved | Landscaping installed by borderland under DEP permit |
06/11/2019 | LANDSCAPE - FINAL | BBENEDON | Approved | Landscaping installed by borderland under DEP permit |
06/11/2019 | MECHANICAL - INTERMEDIATE | MHASSAN | Approved | |
06/11/2019 | MECHANICAL - ABOVE CEILING | MHASSAN | Approved | |
06/11/2019 | PLUMBING - MD GAS/PRECONST MTG | MHASSAN | Approved | |
06/11/2019 | PLUMBING - ABOVE CEILING | MHASSAN | Approved | |
06/11/2019 | ELECTRIC - INTERMEDIATE | MHASSAN | Approved | |
06/11/2019 | STEM WALL/RETAINING WALL | MHASSAN | Approved | |
06/11/2019 | STUCCO MESH | MHASSAN | Approved | |
06/11/2019 | PLUMBING - SEWER HCS CONNECT | MHASSAN | Approved | |
06/11/2019 | U VALUE FOR WINDOW | MHASSAN | Approved | |
06/12/2019 | PLUMBING - FINAL | RSHERRY | Approved | REVIEW OF WATER DISINFECTION REPORT COMPLETED |
06/17/2019 | MECHANICAL - FINAL | MHASSAN | Approved | this approval is for the shell only which consists of mechanical curbs on the roof, and a couple units have been set for future use. However nothing is hooked up and nothing is ducted at this time. |
06/17/2019 | OUTDOOR LIGHTING FINAL | MHASSAN | Approved | all exterior lights are in, unable to test on timer system will check at building final. |
06/17/2019 | ELECTRIC - FINAL | MHASSAN | Approved | make sure to label panels even if it’s only two circuits. |
06/17/2019 | RIGHT OF WAY - FINAL | DR | Approved | |
06/18/2019 | ELECTRIC - OUTDOOR LIGHTING | MHASSAN | Approved | |
07/03/2019 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | Waterflow @ 35 seconds |
07/10/2019 | FIRE - ALARM FINAL | JPEELDAVIS | Approved | |
07/12/2019 | FIRE - FINAL | JPEELDAVIS | Approved | |
07/25/2019 | ENGINEERING - FINAL | RLEDONNE | Approved | Per Brian Last note access from street to building complete. |
07/25/2019 | ELECTRIC - ABOVE CEILING | MHASSAN | Approved | |
07/25/2019 | ELECTRIC - UFER | MHASSAN | Approved | |
07/25/2019 | BUILDING - FINAL | MHASSAN | Approved |