Permit: T18CM08587
Permit Details
Apply Date:
10/26/2018
Applicant:
STEVE NASON
Description:
ALTERATION INTO ASSISTED LVNG
Architects:
- BRIGHT, RICK LANE
Contractors:
- KITTLE DESIGN AND CONSTRUCTION L L C
Permit Reviews
Permit Number - T18CM08587
Permit Status: Withdrwn
Permit Description: ALTERATION INTO ASSISTED LVNG
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/26/2018 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 10/26/2018 | COMPLETED |
| 10/26/2018 | WALK THRU - COMM | 10/26/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM08587
Permit Status: Withdrwn
Permit Description: ALTERATION INTO ASSISTED LVNG
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/26/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: T18CM08587
Permite Description: ALTERATION INTO ASSISTED LVNG
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| BUILDING ABOVE CEILING | N/A | Not Inspected | ||
| BUILDING - FINAL | N/A | Not Inspected | ||
| ELECTRIC - ABOVE CEILING | N/A | Not Inspected | ||
| ELECTRIC - FINAL | N/A | Not Inspected | ||
| FIRE SPKLR - FINAL | N/A | Not Inspected | ||
| FIRE - ALARM FINAL | N/A | Not Inspected | ||
| CERTIFICATE OF OCCUPANCY | N/A | Not Inspected | ||
| FIRE - FINAL | N/A | Not Inspected | ||
| 12/24/2018 | ELECTRIC - INTERMEDIATE | N/A | Not ready for Inspection | call in when work is completed |
Completed Inspections
Permit Status: Withdrwn
Permit Number: T18CM08587
Permit Description: ALTERATION INTO ASSISTED LVNG
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2018 | PLUMBING - INTERMEDIATE | MHASSAN | Approved | |
| 12/24/2018 | FRAMING | MHASSAN | Approved |