Permit: T18CM08221
Permit Details
Apply Date:
10/15/2018
Applicant:
Scott Rumel
Description:
RENOVATION OF PARISH HALL
Permit Reviews
Permit Number - T18CM08221
Permit Status: Expired
Permit Description: RENOVATION OF PARISH HALL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/15/2018 | PLANS OK TO SUBMIT - COMM | 10/16/2018 | COMPLETED |
10/19/2018 | COMMERCIAL - TI | 10/26/2018 | COMPLETED |
10/26/2018 | RESUBMITTAL | 12/17/2018 | COMPLETED |
12/17/2018 | RESUBMITTAL | 01/05/2019 | ACTIVE |
Outstanding Activity Conditions
Permit Number - T18CM08221
Permit Status: Expired
Permit Description: RENOVATION OF PARISH HALL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/15/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T18CM08221
Permit Status: Expired
Permit Description: RENOVATION OF PARISH HALL
Date | Description | Comments |
---|---|---|
05/31/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Outstanding Inspections
Permit Status: Expired
Permit Number: T18CM08221
Permite Description: RENOVATION OF PARISH HALL
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2019 | COT - HCBU - Exterior Clips/Sheathing | N/A | Canceled | {Activity date: 06/26/2019; Status: Not Applicable; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM08221
Permit Description: RENOVATION OF PARISH HALL
Total Completed Inspections - 30
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/26/2019 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 04/26/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - } ; {Activity date: 02/22/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by CBELL1 - Column footings.} | |
06/26/2019 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/24/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Top out for break room and storage room. Bond beam, first lift lintel on South side.} ; {Activity date: 06/19/2019; Status: Partial Approval; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Second lift for the masonry wall for the Storage and Break room is okay for grout.} ; {Activity date: 06/17/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - OK first lift at break room and storage.} ; {Activity date: 06/12/2019; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Work incomplete at this time} ; {Activity date: 06/10/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by CBELL1 - OK top Out and final lift at stage area.} ; {Activity date: 06/04/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - 3rd lift at stage area ok.} ; {Activity date: 05/29/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Third left OK, provide verification from engineer on vertical reinforcing steel below beam pockets, as there is none at this time.} ; {Activity date: 05/24/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - First lift at stage area OK} ; {Activity date: 05/09/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VFLORES1 - Stem wall} | |
08/07/2019 | COT - LCEL - Electrical Progress | Passed | {Activity date: 08/07/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/31/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - New electrical in the store room across from existing restrooms OK to cover.} | |
08/07/2019 | COT - LCBU - Framing | Passed | {Activity date: 08/07/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
08/07/2019 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/07/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
08/07/2019 | COT - LCBU - Roof Nailing | Passed | {Activity date: 08/07/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/24/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Stage area.} | |
08/07/2019 | COT - LCBU - Building Progress | Passed | {Activity date: 08/07/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
08/15/2019 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 08/15/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
08/20/2019 | COT - LCBU - Preslab | Passed | {Activity date: 08/20/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/10/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by CBELL1 - OK at break room, storage, art room} ; {Activity date: 05/22/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by CBELL1 - Plumbing rough at break room OK.} | |
08/20/2019 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 08/20/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
08/20/2019 | COT - LCME - Mechanical Intermediate | Passed | {Activity date: 08/20/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
10/03/2019 | COT - LCME - Mechanical Above Ceiling | Passed | {Activity date: 10/03/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
10/03/2019 | COT - LCPL - Plumbing Above Ceiling | Passed | {Activity date: 10/03/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
10/03/2019 | COT - LCEL - Electrical Above Ceiling | Passed | {Activity date: 10/03/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
10/04/2019 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
10/04/2019 | COT - LCME - Mechanical Progress | Passed | {Activity date: 10/04/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
10/15/2019 | COT - BULD - SWG Clearance | Passed | {Activity date: 10/15/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
11/19/2019 | COT - LCPL - Gas Pressure Test | Passed | {Activity date: 11/19/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
11/19/2019 | COT - LCEL - Electrical Underground | Passed | {Activity date: 11/19/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/28/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - OK at stage area.} ; {Activity date: 06/27/2019; Status: Partial Approval; Inspector: GWEST; Comment: Entered by YLEON1 - DIFFERENT AREA NEEDED TO BE INSPECTED.} ; {Activity date: 03/25/2019; Status: Approved; Inspector: GWEST; Comment: Entered by CBELL1 - } | |
11/19/2019 | COT - LCPL - Plumbing Progress | Passed | {Activity date: 11/19/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/18/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Plumbing rough at back sink area OK to cover.} ; {Activity date: 06/17/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Not complete for test} ; {Activity date: 05/31/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Existing plumbing in walls of existing restroom OK with running test.} | |
11/19/2019 | COT - LCME - Mechanical Final | Passed | {Activity date: 11/19/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
11/19/2019 | COT - LCME - Kitchen Hood | Passed | {Activity date: 11/19/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
11/19/2019 | COT - LCEL - Electrical Final | Passed | {Activity date: 11/19/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
11/19/2019 | COT - LCPL - Plumbing Final | Passed | {Activity date: 11/19/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
11/25/2019 | COT - FCON - Hood System - Final | Passed | {Activity date: 11/25/2019; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - } | |
11/27/2019 | COT - FCON - Alarm - Final | Passed | {Activity date: 11/27/2019; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - } ; {Activity date: 11/25/2019; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - Have contractor call in for inspection on permit T19FC00201} | |
11/27/2019 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 11/27/2019; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - } ; {Activity date: 11/25/2019; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - Have contractor call in inspection on permit T19FC00826} | |
01/03/2020 | COT - LCBU - Building Final | Passed | {Activity date: 01/03/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - Pending other inspections.} ; {Activity date: 11/26/2019; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF THE AIR BALANCE REPORT COMPLETED} ; {Activity date: 11/25/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Builder looking for a TCO for Multi-purpose and Art rooms only. OK to occupy pending other inspections.} | |
01/03/2020 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 01/03/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - } ; {Activity date: 07/17/2019; Status: Partial Approval; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Double layer of 5/8 sheet rock provided at 5he East corridor and classrooms. } |
|
01/08/2020 | COT - FCON - Fire - Final | Passed | {Activity date: 01/08/2020; Status: Approved; Inspector: gsereno1; Comment: Entered by GSERENO1 - } ; {Activity date: 01/03/2020; Status: Partial Approval; Inspector: gsereno1; Comment: Entered by GSERENO1 - Pending verification of Places of Assembly Permit.} ; {Activity date: 11/27/2019; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - OK FOR T.C.O. -Provide Knox FDC plug for Fire department connection -label breaker in electrical panel -Post occupant load sign} ; {Activity date: 11/25/2019; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - -Install "FDC" and "Riser Room" signs -Provide Knox FDC plug for Fire department connection -Operational permit required for Places of Assembly -2 exit signs and emergency light in south hall inoperable -label breaker in electrical panel -Post occupant load sign -Remove tape from sprinkler heads on either side of stage } |