Permit: T18CM07136
Permit Details
Apply Date:
09/10/2018
Applicant:
D AND H AIR CONDITIONING CO,*APA*
Description:
REPLACE: 3.5 TON SPLIT SYSTEM
Contractors:
- D AND H AIR CONDITIONING CO,*APA*
Permit Reviews
Permit Number - T18CM07136
Permit Status: Final
Permit Description: REPLACE: 3.5 TON SPLIT SYSTEM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2018 | WALK THRU - RES | 09/10/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM07136
Permit Status: Final
Permit Description: REPLACE: 3.5 TON SPLIT SYSTEM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/10/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T18CM07136
Permit Description: REPLACE: 3.5 TON SPLIT SYSTEM
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2018 | MECHANICAL - FINAL | MHASSAN | Approved | fuses are 40 amp max fuse size on unit is 35 amp either change fuse size or need a visual on a 35 amp breaker. Also some confusion on what work was done on interior of house. No paperwork on site other than permit. I asked to have contractor give me a call as another site visit may not be necessary. |
| 10/05/2018 | MECHANICAL - INTERMEDIATE | MHASSAN | Approved | |
| 10/05/2018 | ELECTRIC - FINAL | MHASSAN | Approved |