Permit: T18CM05882
Permit Details
Apply Date:
07/30/2018
Applicant:
Description:
POWER PLANT BUILDING
Permit Reviews
Permit Number - T18CM05882
Permit Status: Expired
Permit Description: POWER PLANT BUILDING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/30/2018 | PLANS OK TO SUBMIT - COMM | 08/01/2018 | COMPLETED |
08/14/2018 | PLANS OK TO SUBMIT - COMM | 08/14/2018 | COMPLETED |
08/14/2018 | COMMERCIAL - NEW | 08/29/2018 | COMPLETED |
09/04/2018 | RESUBMITTAL | 10/02/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM05882
Permit Status: Expired
Permit Description: POWER PLANT BUILDING
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/30/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM05882
Permit Description: POWER PLANT BUILDING
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/27/2019 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 03/27/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - } ; {Activity date: 02/25/2019; Status: Partial Approval; Inspector: BJONES; Comment: Entered by CBELL1 - #8 at 12" OC #6 at 8" OC #4 at 32" bent for brace of upper Matt #6 hooks at each bar around perimeter} |
|
03/27/2019 | COT - LCBU - Preslab | Passed | {Activity date: 03/27/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - East , west and south exterior footings and ufers ok to pour} | |
12/09/2019 | TRSP - ROW - Final/Close-Out | Passed | {Activity date: 12/09/2019; Status: Approved; Inspector: B Mong; Comment: Entered by MBRAVIN1 - No ROW issues} | |
08/11/2020 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} | |
08/11/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 12/09/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - complete development package noted on engineer in final for landscape final. } |
|
08/11/2020 | COT - LCBU - Building Final | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 12/09/2019; Status: Not ready for Inspection; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - Need permanent labels for all panel. Need to label all breakers. Install required emergency lights and exit lights. Complete mechanical. Need engineering and fire finals.} |
|
08/11/2020 | COT - LCBU - Framing | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} | |
08/11/2020 | COT - LCEL - Electrical Underground | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 02/25/2019; Status: Partial Approval; Inspector: BJONES; Comment: Entered by CBELL1 - 4-2" conduits and 4-6" conduits at each engine # 1 thru 5 2- Grounding Electrode Conductor at each engine} |
|
08/11/2020 | COT - LCBU - Roof Nailing | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} | |
08/11/2020 | COT - LCBU - Building Progress | Passed | {Activity date: 08/11/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 08/11/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 09/06/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Engine bldgs. 1 2 roof and steel ok} | |
08/13/2020 | COT - FCON - Alarm - Final | Passed | {Activity date: 08/13/2020; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 04/23/2020; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Still need to figure out if they are going to add or remove beam detectors in the engine halls. They do not meet manufacturers specifications or NFPA for install. We did however test them since they are currently installed. Due to COVID-19 fire alarm inspection was performed via FaceTime. Signals to Security were not confirmed.} | |
08/13/2020 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 08/13/2020; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 04/23/2020; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Risers need to be painted, out side bell needs to be installed and tested. Asbuilt drawings need to be submitted to TFD and approved since the PIV's shown were removed.} ; {Activity date: 01/30/2020; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - west building hrydro 210 psi. Need to paint the out side riser} | |
08/13/2020 | COT - FCON - Fire - Final | Passed | {Activity date: 08/13/2020; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 04/23/2020; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - OWNER AND ASHTOM ACCEPT FULL RESPONSIBILITY AND LIABILTY FOR THE FIRE SPRINKLER UNDERGROUND LINES. LINES WERE INSTALLED, BURRIED AND TESTED ACCORDING TO ASHTON. TFD DID NOT WITNESS ANY OF THIS. EAST ENGINE HALL HYDRO WAS ALSO WITNESSED BY TEP AND ASHTOM TFD DID NOT WITNESS Need to pave for fire department access, rooms with FACP's require signs, FDC sign required on both buildings 6" letters red and white reflective. FIRE ALARM SYSTEM MONITORED BY SECURITY NOT OFF SITE REQUIRED BY 72.} |
|
04/01/2022 | ENGR Engineering Final | Passed | {Activity date: 04/01/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/11/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Complete all work and notes on development packages for this project for engineering final.} ; {Activity date: 12/09/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Development package DP17-0267. Must be complete before signing off this permit.} |