Permit: T18CM05269
Permit Details
Status:
C of o
Type:
COMMERCIAL NEW
Address:
7333 E TANQUE VERDE RD
Address NEW:
7333 E TANQUE VERDE RD
Apply Date:
07/06/2018
Applicant:
VENTURE WEST CONSTRUCTION L L C
Description:
OFFICE
Architects:
- EGLIN, EVAN SAR
Contractors:
- VENTURE WEST CONSTRUCTION L L C
Permit Reviews
Permit Number - T18CM05269
Permit Status: C of o
Permit Description: OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/06/2018 | PLANS OK TO SUBMIT - COMM | 07/06/2018 | COMPLETED |
| 07/06/2018 | 3RD PARTY REVIEW - COMMERCIAL | 08/17/2018 | COMPLETED |
| 08/17/2018 | POST 3RD PARTY REVIEW | 08/20/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM05269
Permit Status: C of o
Permit Description: OFFICE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/06/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T18CM05269
Permit Description: OFFICE
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2018 | BUILDING PRE-SLAB | GWest | Approved | |
| 09/14/2018 | STEM WALL/RETAINING WALL | GWest | Approved | |
| 09/14/2018 | EXCAVATION/LAYOUT REBAR & ZON | GWest | Approved | |
| 10/03/2018 | ROOF NAILING | MHASSAN | Approved | |
| 10/30/2018 | REINFORCED MASONRY PRE-GROUT | BJONES | Approved | No Masonary used |
| 10/30/2018 | STUCCO MESH | BJONES | Approved | |
| 11/06/2018 | ELECTRIC - INTERMEDIATE | BJONES | Approved | |
| 11/19/2018 | BUILDING - FINAL | MRAMBER | Approved | |
| 12/07/2018 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | |
| 12/07/2018 | ELECTRIC - ABOVE CEILING | MRAMBER | Approved | |
| 12/07/2018 | SHEET ROCK NAILING | MRAMBER | Approved | |
| 12/07/2018 | BUILDING ABOVE CEILING | MRAMBER | Approved | |
| 12/07/2018 | FRAMING | MRAMBER | Approved | |
| 12/19/2018 | MECHANICAL - INTERMEDIATE | GWEST | Approved | |
| 12/19/2018 | ELECTRIC - UNDERGROUND | GWEST | Approved | |
| 12/19/2018 | U VALUE FOR WINDOW | GWEST | Approved | |
| 12/19/2018 | EXT METAL CLIPS/EXT SHEATHING | GWEST | Approved | |
| 12/20/2018 | FIRE - FINAL | gsereno1 | Approved | |
| 12/20/2018 | MECHANICAL - FINAL | GWEST | Approved | |
| 12/20/2018 | ELECTRIC - FINAL | GWEST | Approved | |
| 12/28/2018 | CERTIFICATE OF OCCUPANCY | DROBERTS | Approved | THE ADA RAMP AT THE NORTHWEST CORNER OF THIS BUILDING EXCEEDS 5% FOR THE RUNNING AND MAY REQUIRE HANDRAIL. THE ENGINEER OF RECORD NEEDS TO VERIFY WITH STEVE SHIELDS IF IT IS A REQUIREMENT FOR THE SIDEWALK TO HAVE HANDRAIL SINCE THIS IS THE SECOND POINT OF EGRESS FROM THIS BUILDING. I TALKED WITH STEVE SHIELDS AND DISCUSSED MY CURRENT CONCERNS, HE WILL DISCUSS THIS SITE WITH THE ENGINEER OF RECORD, AND IT DOES APPEAR THAT IT WILL BE REQUIRED TO HAVE THE HANDRAIL AT THE SIDEWALK LOCATIONS STEEPER THAT 5%. |
| 12/28/2018 | ENGINEERING - FINAL | DROBERTS | Approved | THE ADA RAMP AT THE NORTHWEST CORNER OF THIS BUILDING EXCEEDS 5% FOR THE RUNNING AND MAY REQUIRE HANDRAIL. THE ENGINEER OF RECORD NEEDS TO VERIFY WITH STEVE SHIELDS IF IT IS A REQUIREMENT FOR THE SIDEWALK TO HAVE HANDRAIL SINCE THIS IS THE SECOND POINT OF EGRESS FROM THIS BUILDING. I TALKED WITH STEVE SHIELDS AND DISCUSSED MY CURRENT CONCERNS, HE WILL DISCUSS THIS SITE WITH THE ENGINEER OF RECORD, AND IT DOES APPEAR THAT IT WILL BE REQUIRED TO HAVE THE HANDRAIL AT THE SIDEWALK LOCATIONS STEEPER THAT 5%. |
| 12/28/2018 | CERTIFICATE OF OCCUPANCY | GWEST | Approved | Approved upon completing all COT requirements and other department approvals and sign-offs |