Permit: T18CM05124
Permit Details
Apply Date:
06/29/2018
Applicant:
JOSE L CEJA
Description:
(T18DV03137) FIRE DAMAGE REPAIR
Architects:
- JOSE L CEJA
Contractors:
- DAMAGE CONTROL BUILDERS LLC
Permit Reviews
Permit Number - T18CM05124
Permit Status: Expired
Permit Description: (T18DV03137) FIRE DAMAGE REPAIR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/29/2018 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 06/29/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM05124
Permit Status: Expired
Permit Description: (T18DV03137) FIRE DAMAGE REPAIR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/29/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T18CM05124
Permite Description: (T18DV03137) FIRE DAMAGE REPAIR
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| BUILDING - FINAL | N/A | Not Inspected | ||
| ELECTRIC - FINAL | N/A | Not Inspected | ||
| 03/26/2019 | FRAMING | N/A | Correction Required | Complete framing for water heater room |
| 03/26/2019 | ELECTRIC - INTERMEDIATE | N/A | Correction Required | Install nail plates for wires notched in to soffit blocking |
| 03/26/2019 | PLUMBING - INTERMEDIATE | N/A | Correction Required | No test on DWV piping |
| 03/26/2019 | PLUMBING - GAS PRESSURE TEST | N/A | Correction Required | Test not holding |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM05124
Permit Description: (T18DV03137) FIRE DAMAGE REPAIR
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/05/2018 | ELECTRIC - CONSTRUCTION POWER | BBENEDO1 | Approved | Bill was told to install smoke detectors in bedrooms and halls prior to occupying as instructed to do by Clayton; RECN provided. |
| 07/06/2018 | TEP CLEARANCE - AM | BBENEDON | Approved | RECN |
| 11/14/2018 | ROOF NAILING | ESTEVENS | Approved |