Permit: T18CM05105
Permit Details
Status:
Final
Type:
SINGLE FAMILY NEW
Address:
7231 S VIA TIERRA MESA
Address NEW:
7231 S VIA TIERRA MESA
Apply Date:
06/28/2018
Applicant:
RICHMOND AMERICAN CONSTRUCTION INC
Description:
SFR RICHT913 T17-M0041
Contractors:
- RICHMOND AMERICAN CONSTRUCTION INC
Completed Inspections
Permit Status: Final
Permit Number: T18CM05105
Permit Description: SFR RICHT913 T17-M0041
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2018 | PLUMBING - SEWER HCS CONNECT | MHASSAN1 | Approved | COVERED UP AT TIME OF INSPEC. |
| 07/12/2018 | PLUMBING - ROUGH, SOIL | MHASSAN1 | Approved | |
| 07/17/2018 | ELECTRIC - UNDERGROUND | MHASSAN1 | Approved | MAKE SURE TO INSTALL CONDUIT BEFORE POUR |
| 07/17/2018 | BUILDING PRE-SLAB | MHASSAN1 | Approved | |
| 07/17/2018 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN1 | Approved | |
| 08/02/2018 | EXT METAL CLIPS/EXT SHEATHING | MHASSAN1 | Approved | NEED DETAIL ON BACK SLIDING DOOR HEADER SAYING 12' SPAN IS ACCEPTABLE ON 2BY6 HEADER OR INSTALL 2BY10 HEADER. ALSO MISSING KING STUD ON SAME OPENING. |
| 08/30/2018 | MECHANICAL - INTERMEDIATE | GWest | Approved | |
| 08/30/2018 | PLUMBING - GAS PRESSURE TEST | GWest | Approved | |
| 08/30/2018 | PLUMBING - YARD WTR LINE/TEST | GWest | Approved | |
| 08/30/2018 | PLUMBING - INTERMEDIATE | GWest | Approved | |
| 08/30/2018 | ELECTRIC - CABLE DROP | GWest | Approved | |
| 08/30/2018 | ELECTRIC - CONSTRUCTION POWER | GWest | Approved | TEP = TEC-Done |
| 08/30/2018 | ELECTRIC - UFER | GWest | Approved | |
| 08/30/2018 | U VALUE FOR WINDOW | GWest | Approved | |
| 08/30/2018 | STUCCO MESH | GWest | Approved | |
| 08/30/2018 | FRAMING | GWest | Approved | |
| 08/31/2018 | TEP CLEARANCE - AM | GWEST | Approved | TEC |
| 09/20/2018 | SHEET ROCK NAILING | TVALENC1 | Approved | |
| 10/26/2018 | PLUMBING - PROGRESS | TVALENCIA | Approved | 1- Clear gas meter |
| 10/29/2018 | GAS CLEARANCE | TVALENCIA | Approved | |
| 11/08/2018 | ROOF NAILING | TVALENCIA | Approved | |
| 11/08/2018 | MECHANICAL - FINAL | TVALENCIA | Approved | |
| 11/08/2018 | PLUMBING - FINAL | TVALENCIA | Approved | |
| 11/08/2018 | OUTDOOR LIGHTING FINAL | TVALENCIA | Approved | |
| 11/08/2018 | ELECTRIC - FINAL | TVALENCIA | Approved | |
| 11/08/2018 | BUILDING - FINAL | TVALENCIA | Approved | |
| 11/09/2018 | ELECTRIC - INTERMEDIATE | TVALENCIA | Approved | approved upon 2090 approval from Trinidad |