Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Apply Date:
06/28/2018
Applicant:
RICHMOND AMERICAN CONSTRUCTION INC
Description:
SFR RICHT90817 T17-M0036
Contractors:
  • RICHMOND AMERICAN CONSTRUCTION INC

Permit Reviews

Permit Number - T18CM05102
Permit Status: Final
Permit Description: SFR RICHT90817 T17-M0036
Start Date Submittal Complete Date Status  
06/28/2018 RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU 06/28/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM05102
Permit Status: Final
Permit Description: SFR RICHT90817 T17-M0036
Total Outstanding Activity Conditions - 1
Date Name
06/28/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T18CM05102
Permit Description: SFR RICHT90817 T17-M0036
Total Completed Inspections - 29
Date Description Inspector Results Comments
07/13/2018 PLUMBING - SEWER HCS CONNECT MHASSAN1 Approved
07/13/2018 PLUMBING - ROUGH, SOIL MHASSAN1 Approved
07/19/2018 ELECTRIC - UNDERGROUND MHASSAN1 Approved
07/19/2018 BUILDING PRE-SLAB MHASSAN1 Approved BUILD UP DIRT ON NE CORNER OF SLAB TO HOLD CONCRETE DURING POUR
07/19/2018 EXCAVATION/LAYOUT REBAR & ZON MHASSAN1 Approved
08/03/2018 ROOF NAILING MHASSAN1 Approved
08/03/2018 EXT METAL CLIPS/EXT SHEATHING MHASSAN1 Approved SHIM UNDER A15G - LOAD BEARING POINT IN MIDDLE. REMOVE BLOCK UNDER A04P NOT LOAD BEARING.
08/23/2018 TEP CLEARANCE - AM MHASSAN Approved ECO
08/24/2018 MECHANICAL - INTERMEDIATE BJONES1 Approved IVRS - Inspection :*
08/24/2018 PLUMBING - INTERMEDIATE BJONES1 Approved IVRS - Inspection :*
08/24/2018 FRAMING BJONES1 Approved IVRS - Inspection :*
08/24/2018 ELECTRIC - CABLE DROP DQUINN Approved CLEAR ECO
08/24/2018 FRAMING DQUINN Approved 1- FHA strap over bore at dryer vent and nail completely
2- stud shoe ABS Dirty arm in hall bath
3- Bang plate back side of stove vent
4- nail off all over bore FHA straps
5- screw toilet flanges to floor
6- Frame east edge of master shower surround
08/24/2018 MECHANICAL - INTERMEDIATE DQUINN Approved
08/24/2018 PLUMBING - GAS PRESSURE TEST DQUINN Approved
08/24/2018 PLUMBING - YARD WTR LINE/TEST DQUINN Approved
08/24/2018 PLUMBING - INTERMEDIATE DQUINN Approved
08/24/2018 ELECTRIC - CONSTRUCTION POWER DQUINN Approved
08/24/2018 ELECTRIC - INTERMEDIATE DQUINN Approved
08/24/2018 ELECTRIC - UFER DQUINN Approved
08/24/2018 U VALUE FOR WINDOW DQUINN Approved
08/24/2018 STUCCO MESH DQUINN Approved
09/10/2018 SHEET ROCK NAILING TVALENC1 Approved IVRS - Inspection :*
10/18/2018 GAS CLEARANCE TVALENCIA Approved
10/22/2018 MECHANICAL - FINAL TVALENCIA Approved
10/22/2018 PLUMBING - FINAL TVALENCIA Approved
10/22/2018 OUTDOOR LIGHTING FINAL TVALENCIA Approved
10/22/2018 ELECTRIC - FINAL TVALENCIA Approved
10/22/2018 BUILDING - FINAL TVALENCIA Approved

Documents

File Name Document Type  
None CONSTRPLANS VIEW
None DOCUMENTS VIEW