Permit: T18CM04290
Permit Details
Status:
C of o
Type:
SINGLE FAMILY NEW
Address:
2615 S MISSION RD #1
Address NEW:
2615 S MISSION RD #1
Apply Date:
06/01/2018
Applicant:
TROY WILLIAMS
Description:
NEW SFR
Permit Reviews
Permit Number - T18CM04290
Permit Status: C of o
Permit Description: NEW SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2019 | REVISION - - 1ST | 03/06/2019 | COMPLETED |
| 06/01/2018 | PLANS OK TO SUBMIT - RES | 06/15/2018 | COMPLETED |
| 06/15/2018 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/09/2018 | COMPLETED |
| 07/17/2018 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 07/18/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM04290
Permit Status: C of o
Permit Description: NEW SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/01/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T18CM04290
Permit Description: NEW SFR
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2018 | MECHANICAL - INTERMEDIATE | KEN | Approved | MANUAL J REPORT REQUIRED BEFORE INSPECTION |
| 12/28/2018 | ELECTRIC - UFER | MHASSAN | Approved | not installed |
| 12/28/2018 | BUILDING PRE-SLAB | MHASSAN | Approved | need plumbing rough soil completed |
| 12/28/2018 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN | Approved | only need to see porch footings |
| 01/07/2019 | PLUMBING - SEWER HCS CONNECT | MHASSAN | Approved | |
| 01/07/2019 | PLUMBING - ROUGH, SOIL | MHASSAN | Approved | due to recent rains cannot tell if there are leaks appears to be OK |
| 01/30/2019 | ROOF NAILING | MHASSAN | Approved | |
| 01/30/2019 | EXT METAL CLIPS/EXT SHEATHING | MHASSAN | Approved | |
| 02/26/2019 | STUCCO MESH | MHASSAN | Approved | |
| 03/11/2019 | ELECTRIC - INTERMEDIATE | MHASSAN | Approved | |
| 03/13/2019 | PLUMBING - INTERMEDIATE | MHASSAN | Approved | |
| 06/03/2019 | PLUMBING - YARD WTR LINE/TEST | MHASSAN | Approved | pipe PVC per plan or revise plans. Plan calls for 3/4 to 1 1/2" with a tee going to house 1 before continuing to house 2. Currently it is piped with 2 separate 1 1/4" from tee at meter. |
| 07/23/2019 | TEP CLEARANCE - PM | TVALENCIA | Approved | CODE ECO |
| 07/23/2019 | ELECTRIC - CONSTRUCTION POWER | TVALENCIA | Approved | Clear electric eco |
| 09/06/2019 | GAS CLEARANCE | ESTEVENS | Approved | |
| 09/06/2019 | PLUMBING - GAS PRESSURE TEST | ESTEVENS | Approved | SWG clearance required. |
| 10/02/2019 | MECHANICAL - FINAL | TVALENCIA | Approved | |
| 10/02/2019 | PLUMBING - FINAL | TVALENCIA | Approved | |
| 10/02/2019 | OUTDOOR LIGHTING FINAL | TVALENCIA | Approved | |
| 10/02/2019 | ELECTRIC - FINAL | TVALENCIA | Approved | |
| 10/02/2019 | ELECTRIC - UNDERGROUND | TVALENCIA | Approved | |
| 10/02/2019 | FRAMING | TVALENCIA | Approved | |
| 10/03/2019 | BUILDING - FINAL | tvalencia | Approved | Verified BBenedon inspections, Zoning approved by AHines |
| 10/03/2019 | ZONING - FINAL | AH | Approved | 5 foot opening no longer applicable. 4 parking spaces provided on site, dust proof. |
| 10/03/2019 | ZONING - FINAL | BBENEDON | Approved | Inspector could not find a wall with an opening on site or in the plans. The driveway has DG installed. It appears the plan may have been approved by Alex Hines, I suggested that the builder talk to Zoning and see if this inspection can be removed. |