Permit: T18CM04230
Permit Details
Apply Date:
05/31/2018
Applicant:
DOUCETTE HOMES INC
Description:
SFR DOUC184918 T18-M0020
Contractors:
- DOUCETTE HOMES INC
Permit Reviews
Permit Number - T18CM04230
Permit Status: Expired
Permit Description: SFR DOUC184918 T18-M0020
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/31/2018 | RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU | 06/04/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM04230
Permit Status: Expired
Permit Description: SFR DOUC184918 T18-M0020
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
05/31/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
05/31/2018 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM04230
Permit Description: SFR DOUC184918 T18-M0020
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2018 | PLUMBING - ROUGH, SOIL | MHASSAN1 | Approved | |
06/21/2018 | PLUMBING - YARD WTR LINE/TEST | MHASSAN1 | Approved | NEED ADDRESS SIGNS ON SITE |
06/29/2018 | ELECTRIC - UNDERGROUND | MHASSAN1 | Approved | |
06/29/2018 | BUILDING PRE-SLAB | MHASSAN1 | Approved | |
06/29/2018 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN1 | Approved | FRONT FOOTINGS NEED 3" CLEARANCE ON SIDES OF REBAR |
08/16/2018 | PLUMBING - SEWER HCS CONNECT | GWest | Approved | |
09/26/2018 | EXT METAL CLIPS/EXT SHEATHING | TVALENC1 | Approved | IVRS - Inspection :* |
09/27/2018 | ROOF NAILING | BJONES | Approved | |
11/28/2018 | ELECTRIC - CONSTRUCTION POWER | DQUINN | Approved | |
11/29/2018 | TEP CLEARANCE - AM | DQUINN | Approved | ECO |
12/06/2018 | ELECTRIC - UFER | MHASSAN | Approved | |
12/06/2018 | MECHANICAL - INTERMEDIATE | MHASSAN | Approved | |
12/06/2018 | PLUMBING - INTERMEDIATE | MHASSAN | Approved | shower pan not installed. PEX not completed. Nail plates missing throughout. Pex nor ABS not under test. Stopped inspection. |
12/06/2018 | ELECTRIC - INTERMEDIATE | MHASSAN | Approved | Romex not terminated in multiple spots. Nothing made up at panel. Island receptacles not made up. Stopped inspection. |
12/06/2018 | FRAMING | MHASSAN | Approved | need drawings on site at time of inspection. All penetrations need to be sealed at top plates. Electrical and plumbing not completed. |
01/30/2019 | PLUMBING - GAS PRESSURE TEST | DMUNIZ | Approved | NO GAS |
05/09/2019 | MECHANICAL - FINAL | AKLEINSORGE | Approved | |
05/09/2019 | PLUMBING - FINAL | AKLEINSORGE | Approved | |
05/09/2019 | ELECTRIC - FINAL | AKLEINSORGE | Approved | Label panel noting PT slab |
05/22/2019 | OUTDOOR LIGHTING FINAL | DMUNIZ | Approved | |
05/22/2019 | BUILDING - FINAL | DMUNIZ | Approved | |
05/22/2019 | STUCCO MESH | DMUNIZ | Approved |