Permit: T18CM04229
Permit Details
Apply Date:
05/31/2018
Applicant:
DOUCETTE HOMES INC
Description:
SFR BRCH1268 T16-M0020
Contractors:
- DOUCETTE HOMES INC
Permit Reviews
Permit Number - T18CM04229
Permit Status: Expired
Permit Description: SFR BRCH1268 T16-M0020
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/31/2018 | RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU | 06/04/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM04229
Permit Status: Expired
Permit Description: SFR BRCH1268 T16-M0020
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
05/31/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
05/31/2018 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM04229
Permit Description: SFR BRCH1268 T16-M0020
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2018 | PLUMBING - YARD WTR LINE/TEST | MHASSAN1 | Approved | ADD TRACER WIRE |
06/20/2018 | PLUMBING - ROUGH, SOIL | MHASSAN1 | Approved | |
06/28/2018 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN1 | Approved | SPOKE WITH THE SUPERINTENDENT. HE ASSURED ME THAT THIS PATIO OPTION DOES NOT INCLUDE A TURN DOWN SLAB. |
06/28/2018 | BUILDING PRE-SLAB | MHASSAN1 | Approved | |
06/28/2018 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN1 | Approved | MISSING ANGLE REBAR ON EITHER SIDE OF ENTRY. BACK PATIO OPTION APPEARS TO BE MISSING 8" THICK TURN DOWN SLAB. BACK PATIO FOOTINGS NEED 3" CLEARANCE AROUND REBAR. LEFT OPTION WITH CONTRACTOR TO SEND PHOTOS FOR FULL APPROVAL. |
08/03/2018 | PLUMBING - SEWER HCS CONNECT | GWest | Approved | |
08/30/2018 | ROOF NAILING | GWest | Approved | |
08/30/2018 | EXT METAL CLIPS/EXT SHEATHING | GWest | Approved | |
11/28/2018 | ELECTRIC - CONSTRUCTION POWER | DQUINN | Approved | |
11/28/2018 | ELECTRIC - CABLE DROP | DQUINN | Approved | |
11/29/2018 | TEP CLEARANCE - AM | DQUINN | Approved | ECO |
12/06/2018 | PLUMBING - INTERMEDIATE | MHASSAN | Approved | |
12/11/2018 | PLUMBING - GAS PRESSURE TEST | IVR USER | Approved | IVRS - AP canceled |
12/12/2018 | ELECTRIC - UFER | DMUNIZ | Approved | |
12/12/2018 | MECHANICAL - INTERMEDIATE | DMUNIZ | Approved | |
12/12/2018 | ELECTRIC - INTERMEDIATE | DMUNIZ | Approved | |
12/12/2018 | FRAMING | DMUNIZ | Approved | |
05/09/2019 | MECHANICAL - FINAL | AKLEINSORGE | Approved | |
05/09/2019 | PLUMBING - FINAL | AKLEINSORGE | Approved | |
05/09/2019 | ELECTRIC - FINAL | AKLEINSORGE | Approved | Label panel noting PT slab |
05/22/2019 | OUTDOOR LIGHTING FINAL | DMUNIZ | Approved | |
05/22/2019 | PLUMBING - PROGRESS | DMUNIZ | Approved | |
05/22/2019 | ELECTRIC - UNDERGROUND | DMUNIZ | Approved | |
05/22/2019 | BUILDING - FINAL | DMUNIZ | Approved | |
05/22/2019 | U VALUE FOR WINDOW | DMUNIZ | Approved | |
05/22/2019 | STUCCO MESH | DMUNIZ | Approved |