Permit: T18CM03747
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
123 N GRANDE AV
Address NEW:
123 N GRANDE AV
Apply Date:
05/15/2018
Applicant:
Emma Stahl-Wert
Description:
NEW SFR
Permit Reviews
Permit Number - T18CM03747
Permit Status: Expired
Permit Description: NEW SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/24/2020 | REVISION - - 1ST | 02/24/2021 | COMPLETED |
| 05/15/2018 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 07/01/2019 | COMPLETED |
| 07/01/2019 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/01/2019 | COMPLETED |
| 07/01/2019 | RESIDENTIAL - BLDG/WWM | 07/24/2019 | COMPLETED |
| 07/24/2019 | RESUBMITTAL | 08/23/2019 | COMPLETED |
| 08/15/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/31/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T18CM03747
Permit Status: Expired
Permit Description: NEW SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/07/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Conditions
Permit Number - T18CM03747
Permit Status: Expired
Permit Description: NEW SFR
| Date | Description | Comments |
|---|---|---|
| 05/15/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T18CM03747
Permite Description: NEW SFR
Total Outstanding Inspections - 16
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Masonry Pregrout | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
| 09/13/2023 | RSME - Mechanical Progress | N/A | Canceled | canceled per contractor. 9/13/2023 |
| 01/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | Lower roof and rafter plan per plan okay to proceed. Partial pending frame wall and stairs in home, porch around the home along with the upper roof plan. 9/13/2023 1/19/24: framing at porch around house per plan ok to proceed with sheathing the roof of porch,framing in walls and stairs pending, upper roof plan pending. |
| 09/13/2023 | COT - RSEL - Construction Power | N/A | Canceled | Canceled per contractor. 9/13/2023 |
| 09/13/2023 | COT - LCBU - Framing | N/A | Partial Pass | Lower roof and rafter plan per plan okay to proceed. Partial pending frame wall and stairs in home, porch around the home along with the upper roof plan. 9/13/2023 |
| 08/27/2025 | COT - RSBU - Roof Nailing | N/A | Not Ready | inspection canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM03747
Permit Description: NEW SFR
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2019 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 12/24/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } | |
| 12/10/2020 | COT - RSPL - Rough Soil | Passed | {Activity date: 12/10/2020; Status: Approved; Inspector: RBOOHER; Comment: Entered by PAHUMAD1 - } | |
| 03/07/2023 | COT - RSBU - Masonry Pregrout | Passed | Ok to set anchor bolts for roof and place concrete in progress areas | |
| 09/13/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 09/13/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 04/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/24/2025 | COT - RSEL - Construction Power | Passed | Power is active. | |
| 10/27/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/27/25 partial,pass for electric in loft |