Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address NEW:
5049 E BROADWAY BL #1
Apply Date:
02/23/2018
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
OFFICE
Architects:
  • SONYA SOTINSKY
Contractors:
  • BARKER CONTRACTING INC **APA**

Permit Reviews

Permit Number - T18CM01467
Permit Status: C of o
Permit Description: OFFICE
Start Date Submittal Complete Date Status  
02/23/2018 PLANS OK TO SUBMIT - COMM 02/26/2018 COMPLETED Review Details
03/01/2018 3RD PARTY REVIEW - COMMERCIAL TI 04/27/2018 COMPLETED Review Details
04/27/2018 POST 3RD PARTY REVIEW 10/05/2018 COMPLETED Review Details
10/05/2018 REVISION - - 1ST 10/05/2018 COMPLETED Review Details
10/09/2018 REVISION - - 1ST 10/09/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM01467
Permit Status: C of o
Permit Description: OFFICE
Total Outstanding Activity Conditions - 1
Date Name
02/23/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T18CM01467
Permit Description: OFFICE
Total Completed Inspections - 35
Date Description Inspector Results Comments
05/22/2018 PLUMBING - ROUGH, SOIL BJONES Approved Waste Piping Already Inspected.
06/13/2018 ROOF NAILING TVALENC1 Approved IVRS - Inspection :*
07/13/2018 FRAMING GWest Approved Wall bracing at Ext doors floor 1 and 2. Interior wood stairs at rise and run
07/13/2018 EXT METAL CLIPS/EXT SHEATHING GWest Approved At two expanded Bathrooms.
07/18/2018 PLUMBING - ROOF DRAINS BJONES Approved
08/24/2018 SHEET ROCK NAILING DQUINN Approved OK TO TAPE ALL
08/31/2018 BUILDING PRE-SLAB BJONES1 Approved IVRS - Inspection :*
08/31/2018 EXCAVATION/LAYOUT REBAR & ZON BJONES1 Approved IVRS - Inspection :*
09/04/2018 STEM WALL/RETAINING WALL BJONES Approved WALL NOT READY FOR INSPECTION AT THIS TIME
09/26/2018 ELECTRIC - ABOVE CEILING DFLORES2 Approved
09/28/2018 ELECTRIC - INTERMEDIATE GWEST Approved METER AP
09/28/2018 TEP CLEARANCE - AM GWEST Approved TEC
10/24/2018 MECHANICAL - ABOVE CEILING GWEST Approved
10/24/2018 PLUMBING - ABOVE CEILING GWEST Approved
10/24/2018 ELECTRIC - SERVICE UPGRADE GWEST Approved
10/24/2018 ELECTRIC - UNDERGROUND GWEST Approved
10/24/2018 BUILDING ABOVE CEILING GWEST Approved
11/02/2018 STUCCO MESH GWEST Approved
11/02/2018 MECHANICAL - INTERMEDIATE GWEST Approved
11/02/2018 PLUMBING - INTERMEDIATE GWEST Approved
11/02/2018 U VALUE FOR WINDOW GWEST Approved
11/09/2018 RIGHT OF WAY - FINAL MVV Approved No right of way work per contractor.
11/09/2018 LANDSCAPE - FINAL RLEDONNE Approved
11/09/2018 SIGN - FINAL RLEDONNE Approved
11/09/2018 NPPO - FINAL RLEDONNE Approved
12/07/2018 FIRE - FINAL JPEELDAVIS Approved OK for TCO on the 1st floor.
Need the following items:
3 KNOX Boxes
2 KNOX FDC Caps
1 KNOX Elevator Key Box
1 F.D.C. Sign
1 F.A.C.P. Room Sign
1 Fire Riser Room Sign
Need to have Central Alarm call in the monitoring permit
12/07/2018 FIRE - ALARM FINAL JPEELDAVIS Approved CB tested the fire alarm, need to verify coverage on the plans. Also, will verify the mag locks and if they need to be connected to the fire alarm system
12/07/2018 FIRE SPKLR - FINAL JPEELDAVIS Approved
12/07/2018 MECHANICAL - FINAL GWEST Approved approval upon all COT requirements and other dept sign-offs
12/07/2018 PLUMBING - FINAL GWEST Approved
12/07/2018 OUTDOOR LIGHTING FINAL GWEST Approved
12/07/2018 ELECTRIC - FINAL GWEST Approved
12/07/2018 ELECTRIC - OUTDOOR LIGHTING GWEST Approved
12/07/2018 BUILDING - FINAL GWEST Approved
12/07/2018 ENGINEERING - FINAL RLEDONNE Approved