Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Apply Date:
01/29/2018
Applicant:
RICHMOND AMERICAN CONSTRUCTION INC
Description:
SFR T399 T17-M0063
Contractors:
  • RICHMOND AMERICAN CONSTRUCTION INC

Permit Reviews

Permit Number - T18CM00728
Permit Status: Final
Permit Description: SFR T399 T17-M0063
Start Date Submittal Complete Date Status  
01/29/2018 RESIDENTIAL - BLDG/ZONING-WALKTHRU 02/01/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T18CM00728
Permit Description: SFR T399 T17-M0063
Total Completed Inspections - 26
Date Description Inspector Results Comments
02/05/2018 ELECTRIC - UNDERGROUND DF Approved
02/05/2018 ELECTRIC - UFER DF Approved
02/05/2018 BUILDING PRE-SLAB DF Approved
02/05/2018 EXCAVATION/LAYOUT REBAR & ZON DF Approved
02/05/2018 PLUMBING - SEWER HCS CONNECT D.F. Approved
02/05/2018 PLUMBING - ROUGH, SOIL D.F. Approved
02/13/2018 EXT METAL CLIPS/EXT SHEATHING DFLORES2 Approved
02/13/2018 ROOF NAILING DFLORES2 Approved
02/20/2018 MECHANICAL - INTERMEDIATE DFLORES2 Approved
02/20/2018 PLUMBING - GAS PRESSURE TEST DFLORES2 Approved
02/20/2018 PLUMBING - YARD WTR LINE/TEST DFLORES2 Approved
02/20/2018 PLUMBING - INTERMEDIATE DFLORES2 Approved
02/20/2018 U VALUE FOR WINDOW DFLORES2 Approved
02/20/2018 STUCCO MESH DFLORES2 Approved
02/20/2018 FRAMING DFLORES2 Approved
02/23/2018 ELECTRIC - CONSTRUCTION POWER DFLORES2 Approved
02/23/2018 ELECTRIC - CABLE DROP DFLORES2 Approved
02/27/2018 SHEET ROCK NAILING DFLORES2 Approved
03/15/2018 ELECTRIC - INTERMEDIATE DFLORES2 Approved
03/21/2018 PLUMBING - PROGRESS DFLORES2 Approved CLEAR SW GAS
03/21/2018 OUTDOOR LIGHTING FINAL DFLORES2 Approved CLEAR SW GAS
03/22/2018 GAS CLEARANCE DFLORES Approved
03/28/2018 MECHANICAL - FINAL MHASSAN1 Approved A/C UNIT CALLS FOR A MAX OF 35 AMP, THE BREAKER IN THE PANEL IS 40 AMP. THIS NEEDS TO BE CHANGED. I LET THE CONTRACTOR KNOW.
03/30/2018 PLUMBING - FINAL MHASSAN1 Approved
03/30/2018 ELECTRIC - FINAL MHASSAN1 Approved
03/30/2018 BUILDING - FINAL MHASSAN1 Approved