Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T17RW05428
Permit Details
Apply Date:
12/11/2017
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP WILL BE REPLACING AN EXISTING DISTRIBUTION POLE AND TRANSFORMER BANK AS WELL AS A SPAN OF OVERHEAD SECONDARY FEEDING BARIO BREWERY. WE WILL ALSO BE REPLACING THE POLE ON THE SOUTH SIDE OF SIXTEENTH ST. THERE ARE 4 OTHER UTILITIES ATACHED TO THE POLE.
Completed Inspections
Permit Status: Final
Permit Number: T17RW05428
Permit Description: TEP WILL BE REPLACING AN EXISTING DISTRIBUTION POLE AND TRANSFORMER BANK AS WELL AS A SPAN OF OVERHEAD SECONDARY FEEDING BARIO BREWERY. WE WILL ALSO BE REPLACING THE POLE ON THE SOUTH SIDE OF SIXTEENTH ST. THERE ARE 4 OTHER UTILITIES ATACHED TO THE POLE.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2018 | TDOT-Routine Barricade Inspect | cfarren1 | Approved | work completed - close permit |