Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
800 E 16TH ST
Apply Date:
12/11/2017
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP WILL BE REPLACING AN EXISTING DISTRIBUTION POLE AND TRANSFORMER BANK AS WELL AS A SPAN OF OVERHEAD SECONDARY FEEDING BARIO BREWERY. WE WILL ALSO BE REPLACING THE POLE ON THE SOUTH SIDE OF SIXTEENTH ST. THERE ARE 4 OTHER UTILITIES ATACHED TO THE POLE.

Completed Inspections

Permit Status: Final
Permit Number: T17RW05428
Permit Description: TEP WILL BE REPLACING AN EXISTING DISTRIBUTION POLE AND TRANSFORMER BANK AS WELL AS A SPAN OF OVERHEAD SECONDARY FEEDING BARIO BREWERY. WE WILL ALSO BE REPLACING THE POLE ON THE SOUTH SIDE OF SIXTEENTH ST. THERE ARE 4 OTHER UTILITIES ATACHED TO THE POLE.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/11/2018 TDOT-Routine Barricade Inspect cfarren1 Approved work completed - close permit

Documents

File Name Document Type  
T17RW05428.PDF ROW-RIGHT OF WAY VIEW