Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T17RW04046
Permit Details
Apply Date:
09/13/2017
Applicant:
TUCSON ELECTRIC POWER **B
Description:
Downtown UG Equipment adjustment: TEP will de-energize Vault 33 in front of the McLellan’s/John Wesley Miller Building Diversified will begin work to remove the steel doors and vents and bring to grade. TEP will replace the hatches at Vault 2 Diversified will replace the vents covers to Vault 2 and set to final grade TEP will de-energize Secondary Pull box #113 and Diversified will adjust concrete and lid to final grade TEP to adjust Secondary Pull Box #118 to final grade. TEP to coordinate w/ COT Contractor CITY OF TUCSON/RIO NUEVO STREETSCAPE IMPROVEMENTS U-2016-019 NOTE: TEP WILL BE UTILIZING GRANITE CONSTRUCTION BARRICADING WHICH ENCLOSES THE ENTIRE TEP WORK AREA
Contractors:
- DIVERSIFIED DESIGN AND CONSTRUCTION INC
Completed Inspections
Permit Status: Final
Permit Number: T17RW04046
Permit Description: Downtown UG Equipment adjustment:
TEP will de-energize Vault 33 in front of the McLellan’s/John Wesley Miller Building
Diversified will begin work to remove the steel doors and vents and bring to grade.
TEP will replace the hatches at Vault 2
Diversified will replace the vents covers to Vault 2 and set to final grade
TEP will de-energize Secondary Pull box #113 and Diversified will adjust concrete and lid to final grade
TEP to adjust Secondary Pull Box #118 to final grade.
TEP to coordinate w/ COT Contractor
CITY OF TUCSON/RIO NUEVO STREETSCAPE IMPROVEMENTS U-2016-019
NOTE: TEP WILL BE UTILIZING GRANITE CONSTRUCTION BARRICADING WHICH ENCLOSES THE ENTIRE TEP WORK AREA
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/19/2017 | TDOT-Routine Barricade Inspect | DR | Approved | CIP Inspection. Final. |