Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
07/25/2017
Applicant:
TUCSON ELECTRIC POWER **B
Description:
AFTER THE FACT PRIORITY: TEP REPLACED ONE POLE IN ROW. SOUTHEAST CORNER OF BROADWAY BLVD AND N TUCSON BLVD. JOINT USE AND 3RD PARTY ATTACHERS AFFECTED. SIDE WALK IMPACT. TRAFFIC CONTROL REQUIRED. TPD CASE #1707170233.

Completed Inspections

Permit Status: Final
Permit Number: T17RW03163
Permit Description: AFTER THE FACT PRIORITY: TEP REPLACED ONE POLE IN ROW. SOUTHEAST CORNER OF BROADWAY BLVD AND N TUCSON BLVD. JOINT USE AND 3RD PARTY ATTACHERS AFFECTED. SIDE WALK IMPACT. TRAFFIC CONTROL REQUIRED. TPD CASE #1707170233.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/28/2017 TDOT-Routine Barricade Inspect cfarren Approved - work has already been completed and permit will be closed out

Documents

File Name Document Type  
T17RW03163.PDF ROW-RIGHT OF WAY VIEW