Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
4101 N 1ST AV
Address NEW:
4101 N 1ST AV
Apply Date:
07/11/2017
Applicant:
SOUTHWEST GAS B*
Description:
(2) 5x5 IN ASPHALT ON 1ST AVE TO REPAIR GAS LINE

Completed Inspections

Permit Status: Final
Permit Number: T17RW02973
Permit Description: (2) 5x5 IN ASPHALT ON 1ST AVE TO REPAIR GAS LINE
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/26/2017 TDOT-EXCAV GENERAL INSPECTION DR Approved APL is putting in for Traffic Control permit change to allow for double southbound lane shift on 1st Ave. When Approved APL willpave perm patch on 1st Ave

Documents

File Name Document Type  
T17RW02973.PDF ROW-RIGHT OF WAY VIEW
T17RW02973 R1.PDF ROW-RIGHT OF WAY VIEW
T17RW02973 R2.PDF ROW-RIGHT OF WAY VIEW