Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
3737 S PARK AV
Address NEW:
3737 S PARK AV
Apply Date:
05/30/2017
Applicant:
COX COMMUNICATIONS
Description:
Start point : On the South side of E Ajo Way and E Benson Hwy on the South Side from the TEP pole begin 335' overlash heading West. Continue 140' overlash heading NE crossing E Ajo Way. Continue 190' overlash to TEP Pole on the West side of Evans Blvd 6/23/17 WORK DESCRIPTIN CHANGE: Start point: On the North side of E Ajo Way and E Evans Blvd begin 85' trench bore heading West , place 3x3 pothole, and continue NW 300 trench/bore. Place 3x3 pothole and a new cox pedestal, begin 65' trench/bore crossing E Evans Blvd to out of ROW
Contractors:
  • ALPHA UNDERGROUND CONSTRUCTION CO INC *APA
  • FLASH IT BARRICADES LLC

Completed Inspections

Permit Status: Final
Permit Number: T17RW02304
Permit Description: Start point : On the South side of E Ajo Way and E Benson Hwy on the South Side from the TEP pole begin 335' overlash heading West. Continue 140' overlash heading NE crossing E Ajo Way. Continue 190' overlash to TEP Pole on the West side of Evans Blvd 6/23/17 WORK DESCRIPTIN CHANGE: Start point: On the North side of E Ajo Way and E Evans Blvd begin 85' trench bore heading West , place 3x3 pothole, and continue NW 300 trench/bore. Place 3x3 pothole and a new cox pedestal, begin 65' trench/bore crossing E Evans Blvd to out of ROW
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/07/2017 TDOT-EXCAV GENERAL INSPECTION cfarren1 Approved - work completed - close permit

Documents

File Name Document Type  
T17RW02304.PDF ROW-RIGHT OF WAY VIEW
T17RW02304 R1.PDF ROW-RIGHT OF WAY VIEW
T17RW02304 R2.PDF ROW-RIGHT OF WAY VIEW