Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
02/08/2017
Applicant:
HENSEL PHELPS CONSTRUCTION CO
Description:
PER COORDINATION WITH TEP, SW GAS, COX, CENTURYLINK, AND LEVEL 3, HENSEL PHELPS, DELTA DIVERSIFIED ELECTRICAL, AND PREMIER UNDERGROUND WILL BE INSTALLING NEW CONDUIT UNDERGROUND BY WAY OF TRENCHING AND BORING FOR THE EXISTING OVERHEAD UTILITY LINES TO BE ROUTED UNDERGROUND AT A FUTURE DATE. ALL CROSSINGS OF ALLEN RD WILL BE MADE VIA BORING. ALL PER DP 16-0030. 3/6/17 SCOPE OF WORK CHANGED TO: DETAIL 2 WILL NOW BE TRENCHED INSTEAD OF BORED
Contractors:
  • DELTA DIVERSIFIED ENTERPRISES INC
  • PREMIER UNDERGROUND CONSTRUCTION L L C

Completed Inspections

Permit Status: Final
Permit Number: T17RW00684
Permit Description: PER COORDINATION WITH TEP, SW GAS, COX, CENTURYLINK, AND LEVEL 3, HENSEL PHELPS, DELTA DIVERSIFIED ELECTRICAL, AND PREMIER UNDERGROUND WILL BE INSTALLING NEW CONDUIT UNDERGROUND BY WAY OF TRENCHING AND BORING FOR THE EXISTING OVERHEAD UTILITY LINES TO BE ROUTED UNDERGROUND AT A FUTURE DATE. ALL CROSSINGS OF ALLEN RD WILL BE MADE VIA BORING. ALL PER DP 16-0030. 3/6/17 SCOPE OF WORK CHANGED TO: DETAIL 2 WILL NOW BE TRENCHED INSTEAD OF BORED
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/18/2017 TDOT-EXCAV GENERAL INSPECTION DR Approved

Documents

File Name Document Type  
T17RW00684.PDF ROW-RIGHT OF WAY VIEW
T17RW00684 R1.PDF ROW-RIGHT OF WAY VIEW
T17RW00684 R2.PDF ROW-RIGHT OF WAY VIEW
T17RW00684 R3.PDF ROW-RIGHT OF WAY VIEW