Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T17OT00322
Permit Details
Apply Date:
N/A
Applicant:
AMMTEC ENGINEERING INC
Description:
N/A
Permit Reviews
Permit Number - T17OT00322
Permit Status:
Permit Description:
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/27/2017 | PLANS OK TO SUBMIT - FLOODPLAIN | 03/27/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17OT00322
Permit Status:
Permit Description:
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/27/2017 | March 27, 2017 (No Elevation Certificate Required) The applicant is authorized to use a portion of the FEMA Special Flood Hazard Area Zone AE per the Flood Insurance Rate Maps 04019C2277L, specifically described as 928 East 8th Street (Riekers Lot 3 Blk 1, 124-07-0030) for the purpose of demolishing an existing pool. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard, and Watercourse Amenities, Safety and Habitat regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Unified Development Code, or any other Federal, State, County, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit. The following conditions apply to this permit: 1) This permit becomes invalid and is subject to additional floodplain review, if any required development changes the demolition of the pool, or, if there is any further disturbance within the floodplain other than that outlined in this application. 2) Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 3) All work shall conform to the approved improvement plans (T17BU00131), which are made part of this permit. 4) This Floodplain Use Permit and plans shall be kept in a readily accessible location on site at all times. 5) Any additional future disturbance or construction of the floodplain shall have separate floodplain use permit applications submitted to this office for review and approval. 6) All utility connections shall be sealed from damage from water infiltration. 7) Pools and associated equipment are not insurable under the National Flood Insurance Program. |