Permit: T17CM08833
Permit Details
Apply Date:
11/30/2017
Applicant:
MAHER, JOSEPH SAID JR
Description:
ADD BATHROOM, STEEPLES, ENTRY CANOPY, AND INTERIOR REMODEL
Architects:
- MAHER, JOSEPH SAID JR
Contractors:
- CAT RENOVATIONS LLC
Permit Reviews
Permit Number - T17CM08833
Permit Status: L of c
Permit Description: ADD BATHROOM, STEEPLES, ENTRY CANOPY, AND INTERIOR REMODEL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2018 | RESUBMITTAL - TI ALL | 04/16/2018 | COMPLETED |
| 11/30/2017 | PLANS OK TO SUBMIT - COMM | 11/30/2017 | COMPLETED |
| 12/22/2017 | COMMERCIAL - TI | 01/31/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM08833
Permit Status: L of c
Permit Description: ADD BATHROOM, STEEPLES, ENTRY CANOPY, AND INTERIOR REMODEL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/30/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: L of c
Permit Number: T17CM08833
Permit Description: ADD BATHROOM, STEEPLES, ENTRY CANOPY, AND INTERIOR REMODEL
Total Completed Inspections - 33
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2018 | PLUMBING - SEWER HCS CONNECT | MHASSAN1 | Approved | |
| 05/03/2018 | SITE - SEWER | MHASSAN1 | Approved | |
| 05/18/2018 | PLUMBING - PRE SLAB | RCAMACHO | Approved | |
| 06/14/2018 | BUILDING PRE-SLAB | BBENEDO1 | Approved | IVRS - Inspection :* |
| 06/14/2018 | PLUMBING - ABOVE CEILING | BBENEDO1 | Approved | IVRS - Inspection :* |
| 06/14/2018 | MECHANICAL - INTERMEDIATE | BBENEDO1 | Approved | IVRS - Inspection :* |
| 06/14/2018 | PLUMBING - INTERMEDIATE | BBENEDO1 | Approved | IVRS - Inspection :* |
| 06/14/2018 | ELECTRIC - INTERMEDIATE | BBENEDO1 | Approved | IVRS - Inspection :* |
| 06/14/2018 | FRAMING | BBENEDO1 | Approved | IVRS - Inspection :* |
| 06/14/2018 | ROOF NAILING | BBENEDO1 | Approved | IVRS - Inspection :* |
| 06/14/2018 | EXT METAL CLIPS/EXT SHEATHING | BBENEDO1 | Approved | IVRS - Inspection :* |
| 07/27/2018 | STUCCO MESH | DQUINN | Approved | |
| 10/04/2018 | MECHANICAL - PROGRESS | MRAMBER | Approved | |
| 10/04/2018 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | |
| 10/04/2018 | PLUMBING - PROGRESS | MRAMBER | Approved | |
| 10/04/2018 | ELECTRIC - PROGRESS | MRAMBER | Approved | |
| 10/04/2018 | ELECTRIC - ABOVE CEILING | MRAMBER | Approved | |
| 10/04/2018 | BUILDING - PROGRESS | MRAMBER | Approved | |
| 10/04/2018 | BUILDING ABOVE CEILING | MRAMBER | Approved | |
| 12/12/2018 | MECHANICAL - FINAL | RSHERRY | Approved | AIR BALANCE REPORT REQUIRED |
| 12/13/2018 | FIRE - FINAL | gsereno1 | Approved | |
| 12/13/2018 | BUILDING - FINAL | MHASSAN | Approved | ADA sign needed for remodeled ADA bathroom. Signs needed on doors on either side of alter that doors are to remain unlocked during services or when public is in building. Engineering corrections. |
| 12/13/2018 | PLUMBING - FINAL | MHASSAN | Approved | |
| 12/13/2018 | ELECTRIC - FINAL | MHASSAN | Approved | |
| 12/13/2018 | PLUMBING - BACK WATER VALVE | MHASSAN | Approved | passed this point at time of inspection |
| 12/13/2018 | PLUMBING - ROUGH, SOIL | MHASSAN | Approved | passed this point at time of inspection |
| 12/13/2018 | STEM WALL/RETAINING WALL | MHASSAN | Approved | passed this point at time of inspection |
| 12/13/2018 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN | Approved | passed this point at time of inspection |
| 12/13/2018 | NPPO - FINAL | BBENEDON | Approved | No native plant preservation is shown on plans |
| 12/13/2018 | SIGN - FINAL | BBENEDON | Approved | No signs have been installed. |
| 12/13/2018 | LANDSCAPE - FINAL | BBENEDON | Approved | |
| 12/13/2018 | ENGINEERING - FINAL | BBENEDON | Approved | Install the new accessible parking spaces and access as shown on your plan SP - 1. No work has been done at this time |
| 01/29/2019 | RIGHT OF WAY - FINAL | DROBERTS | Approved |