Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T17CM08062
Permit Details
Apply Date:
10/26/2017
Applicant:
DENNEHY, ANDREW BALLING
Description:
REMODEL SFR & NEW PORCH NPZ review NOTrequired.
Architects:
- DENNEHY, ANDREW BALLING
Contractors:
- FINE LINE BUILDING L L C
Permit Reviews
Permit Number - T17CM08062
Permit Status: Final
Permit Description: REMODEL SFR & NEW PORCH
NPZ review NOTrequired.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/26/2017 | RESUBMITTAL | 10/31/2017 | ACTIVE |
10/26/2017 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 10/26/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM08062
Permit Status: Final
Permit Description: REMODEL SFR & NEW PORCH
NPZ review NOTrequired.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/26/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T17CM08062
Permit Description: REMODEL SFR & NEW PORCH
NPZ review NOTrequired.
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/09/2017 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | REAR PORCH; OK TO PLACE CONCRETE. |
11/14/2017 | ROOF NAILING | JBURGE | Approved | |
12/21/2017 | ELECTRIC - INTERMEDIATE | rbaldwin | Approved | |
12/21/2017 | MECHANICAL - INTERMEDIATE | rbaldwin | Approved | 1 frame attic access 2 provide min 10' dwv test 3 provide min 10psi gas test 4 cripple a/c vents |
12/21/2017 | PLUMBING - GAS PRESSURE TEST | rbaldwin | Approved | 1 frame attic access 2 provide min 10' dwv test 3 provide min 10psi gas test 4 cripple a/c vents |
12/21/2017 | PLUMBING - INTERMEDIATE | rbaldwin | Approved | 1 frame attic access 2 provide min 10' dwv test 3 provide min 10psi gas test 4 cripple a/c vents |
12/21/2017 | FRAMING | rbaldwin | Approved | 1 frame attic access 2 provide min 10' dwv test 3 provide min 10psi gas test 4 cripple a/c vents |
01/05/2018 | PLUMBING - ROUGH, SOIL | NORTH | Approved | |
05/29/2018 | MECHANICAL - FINAL | ESTEVEN1 | Approved | APPROVED |
05/29/2018 | PLUMBING - FINAL | ESTEVEN1 | Approved | APPROVED |
05/29/2018 | ELECTRIC - FINAL | ESTEVEN1 | Approved | APPROVED |
05/29/2018 | BUILDING - FINAL | ESTEVEN1 | Approved | APPROVED |