Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
10100 E GOLF LINKS RD
Apply Date:
10/10/2017
Applicant:
MARK CUEVA, AIA - SEAN DEMARS
Description:
NEW SCHOOL
Architects:
  • CARHUFF, PHILIP ANDREW
Contractors:
  • CANYON BUILDING AND DESIGN LLC *APA*

Permit Reviews

Permit Number - T17CM07679
Permit Status: C of o
Permit Description: NEW SCHOOL
Start Date Submittal Complete Date Status  
02/28/2018 3RD PARTY REVIEW - REVISION/OTHER 03/01/2018 COMPLETED Review Details
10/10/2017 COMMERCIAL - NEW 10/11/2017 COMPLETED Review Details
10/11/2017 3RD PARTY REVIEW - COMMERCIAL 01/18/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T17CM07679
Permit Status: C of o
Permit Description: NEW SCHOOL
Total Outstanding Activity Conditions - 1
Date Name
10/10/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T17CM07679
Permit Description: NEW SCHOOL
Total Completed Inspections - 36
Date Description Inspector Results Comments
02/13/2018 PLUMBING - ROUGH, SOIL RGREENE1 Approved RYAN GREEN- APPROVAL
02/13/2018 ELECTRIC - UNDERGROUND RGREENE1 Approved
04/19/2018 BUILDING PRE-SLAB BJones Approved Stage area Approved to Pour
06/15/2018 TEP CLEARANCE - AM BJONES Approved TEC
06/29/2018 SHEET ROCK NAILING BJONES1 Approved IVRS - Inspection :*
06/29/2018 ROOF NAILING BJONES1 Approved IVRS - Inspection :*
07/10/2018 PLUMBING - ROOF DRAINS GWest Approved
07/10/2018 FRAMING GWest Approved
07/17/2018 PLUMBING - INTERMEDIATE BJONES1 Approved IVRS - Inspection :*
07/25/2018 MECHANICAL - ABOVE CEILING B JONES Approved CLASS ROOMS, BATHROOMS, AND KITCHEN
07/25/2018 PLUMBING - ABOVE CEILING B JONES Approved CLASS ROOMS, BATHROOMS, KITCHEN
07/25/2018 ELECTRIC - ABOVE CEILING B JONES Approved CLASS ROOMS, BATHROOMS, AND KITCHEN
07/25/2018 BUILDING ABOVE CEILING B JONES Approved CLASSROOMS, RESTROOMS, AND KITCHEN
08/02/2018 RIGHT OF WAY - FINAL BMONG Approved SIDEWALK MEETS ADA
08/09/2018 EXCAVATION/LAYOUT REBAR & ZON BJONES Approved BJONES
08/09/2018 STEM WALL/RETAINING WALL BJONES Approved BJONES
08/09/2018 REINFORCED MASONRY PRE-GROUT BJONES Approved
08/09/2018 ELECTRIC - UFER AQUIROZ Approved TCO - AQUIROZ
08/09/2018 PLUMBING - PRE SLAB AQUIROZ Approved APPROVED - AQUIROZ
08/09/2018 SITE - SEWER RGREEN Approved APPROVE- DISCHARGE - RYAN GREEEN - 08-08-2018
08/09/2018 PLUMBING - PROGRESS AQUIORZ Approved
08/09/2018 MECHANICAL - INTERMEDIATE AQUIORZ Approved
08/09/2018 MECHANICAL - PROGRESS AQUIORZ Approved
10/03/2018 ENGINEERING - FINAL DROBERTS Approved MET ONSITE WITH ARMANDO QUIROZ TO WALK THE SITE FOR THE C OF O INSPECTIONS. I HAVE ADVISED WILLIE OF THE REMAINING ISSUES FOR THE SITE ARE AS FOLLOWS: 1) COMPLETE THE SITE AS SHOWN ON THE APPROVED AND REVISED DRAWINGS FOR THE SITE. 2) REPAIR DAMAGED SIDEWALKS AS NEEDED THROUGHOUT THE SITE PRIOR TO THE FINAL ACCEPTANCE AND CLOSURE FOR THE DEVELOPMENT PACKAGE. 3) SUBMIT REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. IN THESE CHANGES THEY WILL NEED TO REFLECT ALL OF THE ROOF DRAINAGE ISSUES AND HOW THEY WILL BE CHANGED. 4) ADD THE SCUPPERS THROUGHOUT THE SITE AS DISCUSSED DURING TODAYS MEETING TO PREVENT THE DEPOSIT OF RAINWATER DIRECTLY ONTO THE PEDESTRIAN ACCESS AREAS(SIDEWALKS) THROUGHOUT THIS SITE. 5) CREATE THE WATER HARVESTING AREAS AS NEEDED AND ENSURE THAT THESE ARE APPROVED ON THE REVISED DRAWINGS. 6) ADD HANDRAIL ON THE NORTHSIDE OF THE SITE AT THE SIDEWALK THAT LEADS OUT TO GOLLINKS ROAD IN THE AREAS THAT EXCEED THE 5% RUNNING SLOPE FOR THE RAMPS. 7) COMPLETE ALL REMAINING SITE WORK AND MAKE SURE THAT ALL AREAS THAT HAVE BEEN DISTURBED HAVE EITHER HYDROSEED OR DG PLACED ON THEM TO PREVENT FUTURE EROSION AND DUST ISSUES FROM ARISING. 8) IN THE NORTHERN PARKING AREAS IT HAS BEEN NOTED THAT THERE ARE SOME DRAINAGE ISSUES WITH PONDING WATER AND EROSION ISSUES THAT HAVE ARISED WITH THE PREVIOUS RAINS. 9) THE WESTERN HANDICAP LOCATIONS HAVE BEEN CHECKED AND ARE OUTSIDE THE MAXIMUM 2% AND WILL NEED TO BE REPAIRED PRIOR TO THE FINAL ACCEPTANCE OF THIS PROJECT. 10) CALL IN ALL INSPECTIONS FOR THE PERMITS TO ENSURE THAT ALL THE PERMITS HAVE BEEN COMPLETED AND CLOSED PRIOR TO THE FINALS. THIS IS NOT TO BE CONSIDERED A FULL AND FINAL LIST OF REMAINING ITEMS THAT MAY NEED TO BE ADDRESSED PRIOR TO THE CLOSURE OF THIS SITE. THAT LIST WILL BE COMPLETED ONCE THE FINAL GRADING INSPECTION IS SCHEDULED AT A LATER DATE.
10/03/2018 ENGINEERING - FINAL BBENEDON Approved Note. all remaining work required shall be completed under the development package permit per Dave Roberts thank you Brian
10/03/2018 ELECTRIC - FINAL aquiroz Approved
10/03/2018 ELECTRIC - PROGRESS aquiroz Approved
10/03/2018 MECHANICAL - FINAL aquiroz Approved
10/03/2018 PLUMBING - FINAL aquiroz Approved
10/03/2018 PLUMBING - YARD WTR LINE/TEST aquiroz Approved
10/03/2018 ELECTRIC - INTERMEDIATE aquiroz Approved
10/03/2018 LANDSCAPE - FINAL BBENEDO1 Approved IVRS - Inspection :*
10/03/2018 SIGN - FINAL BBENEDO1 Approved IVRS - Inspection :*
10/03/2018 NPPO - FINAL BBENEDO1 Approved IVRS - Inspection :*
10/08/2018 FIRE - FINAL CBASALDUA Approved
11/02/2018 BUILDING - FINAL AQUIROZ Approved