Permit: T17CM07638
Permit Details
Apply Date:
10/09/2017
Applicant:
PEPPER VINER DEVELOPMENT CO II L L C
Description:
SFR PEPP0030 T15-M0010
Contractors:
- PEPPER VINER DEVELOPMENT CO II L L C ***APA***
Permit Reviews
Permit Number - T17CM07638
Permit Status: Final
Permit Description: SFR PEPP0030 T15-M0010
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/09/2017 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 10/12/2017 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T17CM07638
Permit Description: SFR PEPP0030 T15-M0010
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2017 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | |
| 11/01/2017 | ELECTRIC - UFER | JBURGE | Approved | |
| 11/01/2017 | BUILDING PRE-SLAB | JBURGE | Approved | |
| 11/01/2017 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | |
| 11/28/2017 | ROOF NAILING | JBURGE | Approved | OK TO DRY-IN ROOF SYSTEM |
| 11/28/2017 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | |
| 12/27/2017 | PLUMBING - GAS PRESS TEST FNL | JBURGE | Approved | USE TEST GUAGE THAT READS 15 PSI MAX. |
| 12/27/2017 | PLUMBING - INTERMEDIATE | JBURGE | Approved | |
| 12/27/2017 | ELECTRIC - TEMPORARY SERVICE | JBURGE | Approved | |
| 12/27/2017 | ELECTRIC - CABLE DROP | JBURGE | Approved | |
| 12/27/2017 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | GARAGE SOUTH WALL - OUTLET NEEDS PUTTY PACK PROTECTION. |
| 12/27/2017 | U VALUE FOR WINDOW | JBURGE | Approved | SOUTH WALL OF BATHROOM - ENLARGING OR REDUCING WINDOW SIZE. |
| 12/27/2017 | STUCCO MESH | JBURGE | Approved | |
| 12/27/2017 | FRAMING | JBURGE | Approved | IN THE FUTURE, ENSURE THAT PENETRATIONS IN JOISTS ARE NECESSARY; DO NOT USE SUCH A LARGE AUGER. ENSURE ALL FLOOR PENETRATIONS ARE FIRE CAULKED. |
| 12/28/2017 | TEP CLEARANCE - AM | JBURGE | Approved | ECO |
| 01/10/2018 | PLUMBING - YARD WTR LINE/TEST | ESTEVEN1 | Approved | APPROVED |
| 01/10/2018 | PLUMBING - SEWER HCS CONNECT | ESTEVEN1 | Approved | APPROVED |
| 01/16/2018 | SHEET ROCK NAILING | ESTEVEN1 | Approved | APPROVED |
| 03/12/2018 | GAS CLEARANCE | BBENEDON | Approved | |
| 03/15/2018 | MECHANICAL - FINAL | MHASSAN1 | Approved | |
| 03/15/2018 | PLUMBING - FINAL | MHASSAN1 | Approved | |
| 03/15/2018 | PLUMBING - GAS PRESSURE TEST | MHASSAN1 | Approved | |
| 03/15/2018 | OUTDOOR LIGHTING FINAL | MHASSAN1 | Approved | |
| 03/15/2018 | ELECTRIC - FINAL | MHASSAN1 | Approved | |
| 03/15/2018 | BUILDING - FINAL | MHASSAN1 | Approved | FINISH FIXING HOLES BY LIGHT FIXTURE AND RETURN AIR AT TOP OF STAIRS |
| 03/15/2018 | BUILDING - PROGRESS | MHASSAN1 | Approved | |
| 12/27/2018 | MECHANICAL - INTERMEDIATE | JBURGE | Approved |