Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY ADDITION
Address NEW:
448 S ALANDALE AV
Apply Date:
09/19/2017
Applicant:
BART HAINES
Description:
ENCLOSE CARPORT INTO BEDROOM AND BATH
Contractors:
  • TERRA COTTA BUILDING AND DEVELOPMENT INC

Permit Reviews

Permit Number - T17CM07197
Permit Status: Final
Permit Description: ENCLOSE CARPORT INTO BEDROOM AND BATH
Start Date Submittal Complete Date Status  
09/19/2017 RESIDENTIAL - BLDG/ZONING-WALKTHRU 09/19/2017 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T17CM07197
Permit Status: Final
Permit Description: ENCLOSE CARPORT INTO BEDROOM AND BATH
Total Outstanding Activity Conditions - 1
Date Name
09/19/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T17CM07197
Permit Description: ENCLOSE CARPORT INTO BEDROOM AND BATH
Total Completed Inspections - 12
Date Description Inspector Results Comments
11/16/2017 MECHANICAL - INTERMEDIATE RGREENE1 Approved
11/16/2017 PLUMBING - INTERMEDIATE RGREENE1 Approved
11/16/2017 ELECTRIC - INTERMEDIATE RGREENE1 Approved
11/16/2017 U VALUE FOR WINDOW RGREENE1 Approved
11/16/2017 FRAMING RGREENE1 Approved
11/16/2017 EXT METAL CLIPS/EXT SHEATHING RGREENE1 Approved
11/16/2017 BUILDING PRE-SLAB RGREENE1 Approved
11/16/2017 EXCAVATION/LAYOUT REBAR & ZON RGREENE1 Approved
11/16/2017 MECHANICAL - FINAL RGREENE1 Approved
11/16/2017 PLUMBING - FINAL RGREENE1 Approved THIS BEDROOM ADDITION WAS CONSTRUCTED WITHOUT A PERMIT UPON INSPECTION THE INSTALLATION APPEARS TO BE CODE COMPLIANT. THE DWV WERE SIZED APPROPRIATLY AND CLEANOUTS WERE IN PLACE.
11/16/2017 ELECTRIC - FINAL RGREENE1 Approved THIS BEDROOM ADDITION WAS CONSTRUCTED WITHOUT A PERMIT. UPON INSPECTION IT APPEARS THAT THE INSTALLATION WAS CODE COMPLIANT. THE OUTLETS WERE SPACE ACCORDING TO CODE. THE BEDROOM WAS ON ITS OWN afci CIRCUIT AND THE BATHROOM OUTLETS WERE GFCI. THE THROWS OVER THE ATTIC RAFTERS WERE SIZED AND SPACED ACCORDINGLY.
11/16/2017 BUILDING - FINAL RGREENE1 Approved THIS BEDROOM ADDITION WAS CONSTRUCTED WITHOUT A PERMIT. UPON INSPECTION THE BUILDING APPEARS TO BE CODE COMPLIANT. INSULATION, FOOTING DEPTH, HEADERS, AND ROOF FRAMING WERE VERIFIED.

Documents

File Name Document Type  
None CONSTRPLANS VIEW
None DOCUMENTS VIEW