Apply Date:
08/11/2017
Applicant:
COVARRUBIAS DE LA ROSA CESAR
Description:
ACCESSORY BUILDING LIVING SPACE
Permit Reviews
Permit Number - T17CM06189
Permit Status: Final
Permit Description: ACCESSORY BUILDING LIVING SPACE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/02/2018 | REVISION - - 1ST | 02/02/2018 | COMPLETED |
| 03/16/2018 | REVISION - - 2ND | 03/16/2018 | COMPLETED |
| 05/25/2018 | REVISION - - 3RD | 05/25/2018 | COMPLETED |
| 08/11/2017 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 08/11/2017 | COMPLETED |
| 08/11/2017 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/08/2017 | COMPLETED |
| 12/04/2017 | RESUBMITTAL | 12/04/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM06189
Permit Status: Final
Permit Description: ACCESSORY BUILDING LIVING SPACE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/11/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T17CM06189
Permit Description: ACCESSORY BUILDING LIVING SPACE
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2018 | PLUMBING - ROUGH, SOIL | MHASSAN1 | Approved | |
| 03/19/2018 | BUILDING PRE-SLAB | MHASSAN1 | Approved | PLANS CALL FOR TERMITE TREATED SOIL, MAKE SURE TO DO THIS BEFORE CONCRETE POUR |
| 03/19/2018 | EXCAVATION/LAYOUT REBAR & ZON | MHASSAN1 | Approved | |
| 07/31/2018 | REINFORCED MASONRY PRE-GROUT | TVALENC1 | Approved | IVRS - Inspection :* |
| 11/05/2018 | ROOF NAILING | GWEST | Approved | |
| 12/11/2018 | FRAMING | DQUINN | Approved | Depending on insulation type, fire blocking is needed at all furred walls and drop soffits. This will be inspected at intermediates with insulation designation. |
| 06/07/2019 | STEM WALL/RETAINING WALL | RCHANDLER | Approved | |
| 06/07/2019 | U VALUE FOR WINDOW | RCHANDLER | Approved | |
| 06/07/2019 | PLUMBING - INTERMEDIATE | RCHANDLER | Approved | |
| 08/21/2019 | ELECTRIC - INTERMEDIATE | RCHANDLER | Approved | |
| 05/08/2020 | MECHANICAL - INTERMEDIATE | TTREMBULAK | Approved | RVI |
| 09/30/2020 | BUILDING - FINAL | LMakus | Approved | Final Elevation Certificate Required. |
| 10/09/2020 | ELECTRIC - FINAL | TTREMBULAK | Approved | Approved |
| 10/09/2020 | MECHANICAL - FINAL | TTREMBULAK | Approved | Approved |
| 06/02/2021 | PLUMBING - FINAL | RELEFANTE | Approved |