Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T17CM02479
Permit Details
Apply Date:
03/30/2017
Applicant:
TORTOLITA VALLEY HOMES L L C
Description:
NEW SFR ISLE2325 T17-M0007
Contractors:
- TORTOLITA VALLEY HOMES L L C
Permit Reviews
Permit Number - T17CM02479
Permit Status: Final
Permit Description: NEW SFR ISLE2325 T17-M0007
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/30/2017 | RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU | 04/04/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM02479
Permit Status: Final
Permit Description: NEW SFR ISLE2325 T17-M0007
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/30/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T17CM02479
Permit Description: NEW SFR ISLE2325 T17-M0007
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2017 | PLUMBING - ROUGH, SOIL | DQUINN | Approved | |
06/12/2017 | PLUMBING - YARD WTR LINE/TEST | DQUINN | Approved | |
06/12/2017 | PLUMBING - SEWER HCS CONNECT | DQUINN | Approved | |
06/12/2017 | SITE - SEWER | DQUINN | Approved | |
06/19/2017 | EXCAVATION/LAYOUT REBAR & ZON | BSTEVENS | Approved | Need Engineer Finial |
06/19/2017 | PLUMBING - PRE SLAB | BSTEVENS | Approved | |
06/19/2017 | ELECTRIC - UFER | BSTEVENS | Approved | |
06/19/2017 | BUILDING PRE-SLAB | BSTEVENS | Approved | |
07/27/2017 | ENGINEERING - FINAL | DROBERTS | Approved | INSPECTED THE SITE FOR DRAINAGE ISSUES THAT HAVE BEEN RAISED. NO DRAINAGE OPENNINGS HAVE BEEN PROVIDED IN THE EASTERN WALL AT THIS TIME, THE WATER APPEARS TO BE BLOCKED FROM ITS NATURAL FLOW PATTERNS. I WILL DISCUSS THIS WITH THE ZONING AND ENGINEERING FOLKS SO THAT WE CAN ENSURE THAT ALL THE CODES HAVE BEEN MET. |
09/26/2017 | ELECTRIC - CABLE DROP | ESTEVEN1 | Approved | RESULT ENTERED BY B STEVENS BASED ON PAPERWORK ON SITE. 10/25/17 |
09/26/2017 | ROOF NAILING | ESTEVEN1 | Approved | RESULT ENTERED BY B STEVENS BASED ON PAPERWORK ON SITE. 10/25/17 |
09/26/2017 | EXT METAL CLIPS/EXT SHEATHING | ESTEVEN1 | Approved | RESULT ENTERED BY B STEVENS BASED ON PAPERWORK ON SITE. 10/25/17 |
10/25/2017 | ELECTRIC - INTERMEDIATE | BSTEVENS | Approved | |
10/25/2017 | U VALUE FOR WINDOW | BSTEVENS | Approved | |
10/25/2017 | STUCCO MESH | BSTEVENS | Approved | |
10/25/2017 | FRAMING | BSTEVENS | Approved | |
10/25/2017 | PLUMBING - INTERMEDIATE | BSTEVENS | Approved | |
10/25/2017 | MECHANICAL - INTERMEDIATE | BSTEVENS | Approved | |
11/07/2017 | SHEET ROCK NAILING | BSTEVENS | Approved | |
11/20/2017 | ELECTRIC - TEMPORARY SERVICE | BSTEVENS | Approved | TMPP |
03/21/2018 | ELECTRIC - UNDERGROUND | BJones | Approved | |
03/21/2018 | MECHANICAL - FINAL | BJones | Approved | |
03/21/2018 | PLUMBING - FINAL | BJones | Approved | |
03/21/2018 | ELECTRIC - FINAL | BJones | Approved | |
03/23/2018 | BUILDING - FINAL | mrusso | Approved | per the Engineering and Zoning inspection approvals |
03/23/2018 | ZONING - FINAL | MRUSSO | Approved |