Status:
Final
Type:
Partial Closure
Apply Date:
01/19/2016
Applicant:
LLOYD CONSTRUCTION
Description:
FOOTING EXCAVATION FOR AC HOTEL TUCSON, ELECTRICAL LINES CROSSING AZ AV ASSOCIATED WITH PIA 717PI00014 10/11/2016-RENEWED R3 CHANGE OF WORK HOURS STARTING AT 6PM TO 6AM ON OCT. 17 THRU OCT. 19, 2016 06/20/2017-CLOSE 2 LANES OF BROADWAY FROM 6PM-6AM FOR TOWER CRANE REMOVAL AT 151 E BROADWAY. TRAFFIC WILL BE DETOURED PER THE ATTACHED PLAN. THE STREET CAR AND BUSES WILL BE ABLE TO USE THE TRACK LANE DURING THE SHUTDOWN. BUS BRIDGE TO BE PROVIDED TPD POINT CONTROL 06/27/2017- REMOVAL OF TOWER CRANE NOT COMPLETED. 06/28/2017-LOADING OF TRUCKS WITH REMAINING CRANE PIECES, NEEDING TO SHIFT THE BARRIERS AND CLOSE TWO LANES FROM MIDNIGHT TO 5:00AM 07/03/2017-SHIFT TWO LANES ON BROADWAY FOR CONCRETE PUMP FROM 12AM TO 6AM FOR 07/06/2017 7/14/17 DEMO OF SIDEWALK ALONG BROADWAY BL. DEMO OF SIDEWALK ALONG WEST SIDE OF 5TH AVE. THIS WILL COORDINATE WITH SUNLINK DE-ENERGIZING OF THE POWER LINES SUNDAY, 7/23/17 TO THURSDAY, 7/27/17 08/15/2017-TO SHUTTHE NORTH LANE OF BROADWAY DOWN ON SATURDAY AND SUNDAY FROM 6:00AM T0 2:00PM -WORK INCLUDES CONCRETE, METAL PANELS, LANDSCAPING DELIVERIES OF MATIERALS

Outstanding Inspections

Permit Status: Final
Permit Number: T16TC00134
Permite Description: FOOTING EXCAVATION FOR AC HOTEL TUCSON, ELECTRICAL LINES CROSSING AZ AV ASSOCIATED WITH PIA 717PI00014 10/11/2016-RENEWED R3 CHANGE OF WORK HOURS STARTING AT 6PM TO 6AM ON OCT. 17 THRU OCT. 19, 2016 06/20/2017-CLOSE 2 LANES OF BROADWAY FROM 6PM-6AM FOR TOWER CRANE REMOVAL AT 151 E BROADWAY. TRAFFIC WILL BE DETOURED PER THE ATTACHED PLAN. THE STREET CAR AND BUSES WILL BE ABLE TO USE THE TRACK LANE DURING THE SHUTDOWN. BUS BRIDGE TO BE PROVIDED TPD POINT CONTROL 06/27/2017- REMOVAL OF TOWER CRANE NOT COMPLETED. 06/28/2017-LOADING OF TRUCKS WITH REMAINING CRANE PIECES, NEEDING TO SHIFT THE BARRIERS AND CLOSE TWO LANES FROM MIDNIGHT TO 5:00AM 07/03/2017-SHIFT TWO LANES ON BROADWAY FOR CONCRETE PUMP FROM 12AM TO 6AM FOR 07/06/2017 7/14/17 DEMO OF SIDEWALK ALONG BROADWAY BL. DEMO OF SIDEWALK ALONG WEST SIDE OF 5TH AVE. THIS WILL COORDINATE WITH SUNLINK DE-ENERGIZING OF THE POWER LINES SUNDAY, 7/23/17 TO THURSDAY, 7/27/17 08/15/2017-TO SHUTTHE NORTH LANE OF BROADWAY DOWN ON SATURDAY AND SUNDAY FROM 6:00AM T0 2:00PM -WORK INCLUDES CONCRETE, METAL PANELS, LANDSCAPING DELIVERIES OF MATIERALS
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/05/2016 TDOT-Routine Barricade Inspect N/A Continued

Documents

File Name Document Type  
T16TC00134 FOR T15TC01848 R5.PDF BARRICADES VIEW
T16TC00134 R1 PLN CHANGE.PDF BARRICADES VIEW
T16TC00134 R2.PDF BARRICADES VIEW
T16TC00134 R3.PDF BARRICADES VIEW
T16TC00134 R4.PDF BARRICADES VIEW
T16TC00134 R8.PDF BARRICADES VIEW
T16TC00134 R7.PDF BARRICADES VIEW
T16TC00134 R6.PDF BARRICADES VIEW
T16TC00134 R9.PDF BARRICADES VIEW
T16TC00134 R10.PDF BARRICADES VIEW
T16TC00134 R11.PDF BARRICADES VIEW
T16TC00134 R12.PDF BARRICADES VIEW