Permit: T16TC00134
Permit Details
Apply Date:
01/19/2016
Applicant:
LLOYD CONSTRUCTION
Description:
FOOTING EXCAVATION FOR AC HOTEL TUCSON, ELECTRICAL LINES CROSSING AZ AV ASSOCIATED WITH PIA 717PI00014 10/11/2016-RENEWED R3 CHANGE OF WORK HOURS STARTING AT 6PM TO 6AM ON OCT. 17 THRU OCT. 19, 2016 06/20/2017-CLOSE 2 LANES OF BROADWAY FROM 6PM-6AM FOR TOWER CRANE REMOVAL AT 151 E BROADWAY. TRAFFIC WILL BE DETOURED PER THE ATTACHED PLAN. THE STREET CAR AND BUSES WILL BE ABLE TO USE THE TRACK LANE DURING THE SHUTDOWN. BUS BRIDGE TO BE PROVIDED TPD POINT CONTROL 06/27/2017- REMOVAL OF TOWER CRANE NOT COMPLETED. 06/28/2017-LOADING OF TRUCKS WITH REMAINING CRANE PIECES, NEEDING TO SHIFT THE BARRIERS AND CLOSE TWO LANES FROM MIDNIGHT TO 5:00AM 07/03/2017-SHIFT TWO LANES ON BROADWAY FOR CONCRETE PUMP FROM 12AM TO 6AM FOR 07/06/2017 7/14/17 DEMO OF SIDEWALK ALONG BROADWAY BL. DEMO OF SIDEWALK ALONG WEST SIDE OF 5TH AVE. THIS WILL COORDINATE WITH SUNLINK DE-ENERGIZING OF THE POWER LINES SUNDAY, 7/23/17 TO THURSDAY, 7/27/17 08/15/2017-TO SHUTTHE NORTH LANE OF BROADWAY DOWN ON SATURDAY AND SUNDAY FROM 6:00AM T0 2:00PM -WORK INCLUDES CONCRETE, METAL PANELS, LANDSCAPING DELIVERIES OF MATIERALS
Outstanding Inspections
Permit Status: Final
Permit Number: T16TC00134
Permite Description: FOOTING EXCAVATION FOR AC HOTEL TUCSON, ELECTRICAL LINES CROSSING AZ AV
ASSOCIATED WITH PIA 717PI00014
10/11/2016-RENEWED R3 CHANGE OF WORK HOURS STARTING AT 6PM TO 6AM ON OCT. 17 THRU OCT. 19, 2016
06/20/2017-CLOSE 2 LANES OF BROADWAY FROM 6PM-6AM FOR TOWER CRANE REMOVAL AT 151 E BROADWAY. TRAFFIC WILL BE DETOURED PER THE ATTACHED PLAN. THE STREET CAR AND BUSES WILL BE ABLE TO USE THE TRACK LANE DURING THE SHUTDOWN.
BUS BRIDGE TO BE PROVIDED
TPD POINT CONTROL
06/27/2017- REMOVAL OF TOWER CRANE NOT COMPLETED.
06/28/2017-LOADING OF TRUCKS WITH REMAINING CRANE PIECES, NEEDING TO SHIFT THE BARRIERS AND CLOSE TWO LANES FROM MIDNIGHT TO 5:00AM
07/03/2017-SHIFT TWO LANES ON BROADWAY FOR CONCRETE PUMP FROM 12AM TO 6AM FOR 07/06/2017
7/14/17 DEMO OF SIDEWALK ALONG BROADWAY BL.
DEMO OF SIDEWALK ALONG WEST SIDE OF 5TH AVE. THIS WILL COORDINATE WITH SUNLINK DE-ENERGIZING OF THE POWER LINES SUNDAY, 7/23/17 TO THURSDAY, 7/27/17
08/15/2017-TO SHUTTHE NORTH LANE OF BROADWAY DOWN ON SATURDAY AND SUNDAY FROM 6:00AM T0 2:00PM -WORK INCLUDES CONCRETE, METAL PANELS, LANDSCAPING DELIVERIES OF MATIERALS
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/05/2016 | TDOT-Routine Barricade Inspect | N/A | Continued |