Permit: T16RW02342
Permit Details
Status:
Final
Type:
Barricade and Excavation
Address:
1215 E WAREHOUSE AV
Address NEW:
1215 E WAREHOUSE AV
Apply Date:
10/29/2016
Applicant:
COX COMMUNICATIONS
Description:
Starting at the North side corner of Warehouse Ave riser down trench/bore 510' going east to TEP pole and riser up. On the corner of Warehouse and South Curtis riser down trench 510' west on Warehouse Ave to TEP pole and riser up. Starting on the W side of S Curtis heading E across S Kino Parkway, 300' pull through existing conduit. On the NW corner of S Mountain Ave heading S across 22nd St, 150' bore/trench to TEP pole riser up. 12/28/2016- R2- Riser Down trench/bore on the Northside of Warehouse Ave 1100' going East, pothole every 300- 500 ft as needed. At pot hole, go South 70' trench/ bore to out ROW. Starting on the West side of Curtis heading East across S Kino Parkway 300'pull through existing conduit. On the NW corner of S Mountain Ave heading S across 22nd St 150' bore/trench to TEP Pole riser up WORK ORDER # 41520160000CTU0305
Contractors:
- ALPHA UNDERGROUND CONSTRUCTION CO INC *APA
Completed Inspections
Permit Status: Final
Permit Number: T16RW02342
Permit Description: Starting at the North side corner of Warehouse Ave riser down trench/bore 510' going east to TEP pole and riser up. On the corner of Warehouse and South Curtis riser down trench 510' west on Warehouse Ave to TEP pole and riser up. Starting on the W side of S Curtis heading E across S Kino Parkway, 300' pull through existing conduit. On the NW corner of S Mountain Ave heading S across 22nd St, 150' bore/trench to TEP pole riser up.
12/28/2016- R2- Riser Down trench/bore on the Northside of Warehouse Ave 1100' going East, pothole every 300- 500 ft as needed. At pot hole, go South 70' trench/ bore to out ROW. Starting on the West side of Curtis heading East across S Kino Parkway 300'pull through existing conduit. On the NW corner of S Mountain Ave heading S across 22nd St 150' bore/trench to TEP Pole riser up
WORK ORDER # 41520160000CTU0305
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2016 | TDOT-EXCAV GENERAL INSPECTION | ROLSON | Approved |