Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T16RW02124
Permit Details
Apply Date:
10/20/2016
Applicant:
COX COMMUNICATIONS**B
Description:
Riser down 25', heading West on 22nd St 10' bore/trench. Heading south across 22nd St 120' bore/trench , 30' to ROW 12/5/16 APPLICANT CHANGED DESCRIPTION TO: Change: From the tie point on E 22nd St , begin 12' bore/ trench heading N, 3x3x3 pothole, than begin 328' bore/trench heading East on 22nd. Place ped and 11/4 port tap and begin 36' bore/trench , heading East. 3x3x3 asphalt pothole than head South 25' to out ROW
Contractors:
- ALPHA UNDERGROUND CONSTRUCTION CO INC *APA
- TRUENET COMMUNICATIONS CORP
Completed Inspections
Permit Status: Final
Permit Number: T16RW02124
Permit Description: Riser down 25', heading West on 22nd St 10' bore/trench. Heading south across 22nd St 120' bore/trench , 30' to ROW
12/5/16 APPLICANT CHANGED DESCRIPTION TO:
Change: From the tie point on E 22nd St , begin 12' bore/ trench heading N, 3x3x3 pothole, than begin 328' bore/trench heading East on 22nd. Place ped and 11/4 port tap and begin 36' bore/trench , heading East. 3x3x3 asphalt pothole than head South 25' to out ROW
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/01/2016 | TDOT-Routine Barricade Inspect | BMONG | Approved |