Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
9101 E 22ND ST
Apply Date:
06/24/2016
Applicant:
SOUTHWEST GAS
Description:
Installing new pipeline facilities: in dirt open trench: 2' of 4" STL, 330' of 4" PE, 5' of 6" STL, 1,022' of 8" STL 1,286' of 4" PE & 8" STL in joint trench, 2' of 12" STL. In pavement open trench: 135' of 4" PE, 4' of 6" STL, 315' OF 8" STL, 675' of 4". SEE FLOODPLAIN USE PERMIT #1468 FOR CONDITIONS.
Contractors:
  • NPL CONSTRUCTION CO

Outstanding Activity Conditions

Permit Number - T16RW00200
Permit Status: Final
Permit Description: Installing new pipeline facilities: in dirt open trench: 2' of 4" STL, 330' of 4" PE, 5' of 6" STL, 1,022' of 8" STL 1,286' of 4" PE & 8" STL in joint trench, 2' of 12" STL. In pavement open trench: 135' of 4" PE, 4' of 6" STL, 315' OF 8" STL, 675' of 4". SEE FLOODPLAIN USE PERMIT #1468 FOR CONDITIONS.
Total Outstanding Activity Conditions - 1
Date Name
06/24/2016 ROADWAY IS UNDER A NO CUT PAVEMENT MORATORIUM, PAVEMENT CUTS ARE NOT PERMITTED WITHOUT PRIOR WRITTEN APPROVAL FROM TDOT. Pavement repair for potholes in areas under pavement cut moratorium will be per MAG Standard 212 Type B. Old Spanish Trial south of 22nd St is under a pavement cut moratorium. No pavement cuts are not permitted without written permission from TDOT.

Completed Inspections

Permit Status: Final
Permit Number: T16RW00200
Permit Description: Installing new pipeline facilities: in dirt open trench: 2' of 4" STL, 330' of 4" PE, 5' of 6" STL, 1,022' of 8" STL 1,286' of 4" PE & 8" STL in joint trench, 2' of 12" STL. In pavement open trench: 135' of 4" PE, 4' of 6" STL, 315' OF 8" STL, 675' of 4". SEE FLOODPLAIN USE PERMIT #1468 FOR CONDITIONS.
Total Completed Inspections - 1
Date Description Inspector Results Comments
12/21/2016 TDOT-Routine Barricade Inspect Bravin Approved Testing all week on main line, Main line passed on 12/20/16. Tyiing in at bell holes and will slurry today

Documents

File Name Document Type  
T16RW00200.PDF ROW-RIGHT OF WAY VIEW
TDOT FUP 1468.PDF ROW-RIGHT OF WAY VIEW
DRAINAGE STATEMENT.PDF ROW-RIGHT OF WAY VIEW
ROBB WASH HEC-RAS.PDF ROW-RIGHT OF WAY VIEW
T16RW00200 R1.PDF ROW-RIGHT OF WAY VIEW
T16RW00200 R2.PDF ROW-RIGHT OF WAY VIEW
T16RW00200 R4.PDF ROW-RIGHT OF WAY VIEW